PERMIT APPLICATION COMMON
Is work in the right-of-way (street or alley) required?:
No
Choose the Primary Property Use:
Commercial
Project Value:
1500000
PERMIT TRACKING COMMON
Review Level:
Full C
Application Completed Date:
12/21/2017
Permit Issued Date:
06/20/2018
Inspections Completed Date:
08/28/2019
CONSTRUCTION VALUATION INFO
Intake Value: New:
0
Intake Value: Alteration:
1500000
Total Intake Value:
1500000
Issue Value: New:
0
Issue Value: Alteration:
0
Total Issued Value:
0
BUILDING CODE INFO
What building code was used for your design?:
2015 SBC
Is this a substantial alteration?:
No
Action Type:
Add/Alt
Will you change the building use or occupancy?:
No
Is a certificate of occupancy required?:
No
GROUND DISTURBANCE
Land Disturbing Activity:
Yes
Is your development site in an environmentally critical area (ECA)?:
No
I, the owner or owner’s authorized representative of the property referenced in this submission, give the City of Seattle Department of Planning and Development permission to conduct a Pre-Application Site Visit. I agree that: 1) electronic filing constitutes an authorizing signature; 2) I will inform all tenants of the site visit prior to the inspection being conducted; and 3) if conditions such as uncontrolled dogs or uncooperative tenants hinder the inspector’s ability to conduct the site visit, the site visit will not occur and the site visit fee may be forfeited.:
Yes
LAND USE STREET ELEMENTS
Number of Curb Cuts for This Permit:
0
Tenant Relocation Assistance
Residential Unit Occupancy:
Unit(s) on Property Not Affected by Scope
WASTE DIVERSION
Waste Diversion Plan Required:
Yes
MECHANICAL CODE
Does your project include an HVAC mechanical system?:
No
SIDE SEWER INFORMATION
Related New Construction Project:
6623644
Temporary Dewatering for Construction:
No
Pipe Lining on Private Property:
No
Pipe Lining in the Right-of-Way:
No
Side Sewer Conflict:
No
Side Sewer Conflict Description:
No
Is the system required by the Department of Ecology?:
No
Curb Crossing and/or Staging:
No
Excavation:
No
Roadway Restoration:
No
DRAINAGE INFORMATION
Number of Service Drain Lines Capped:
0
Drainage Type of Work:
Addition/Alteration
Number of New Drainage Connections to the Main:
0
Number of Other New Drainage Connections:
1
Number of Drainage New/Replaced/Repair Pumps:
0
Flow Control Type:
No Control
Flow Control Standard:
Peak
Treatment Standard Type:
Basic
Discharge Point:
On Site
Discharge Point Other Type:
Private Drainage System
Total Disturbed Area:
100728
New Impervious Surface:
17000
New Plus Replaced Impervious Surface:
28774
Total Volume Managed by On-Site Stormwater Management (gallons):
168424
Total Area Requiring Soil Amendment:
71954
SANITARY INFORMATION
Sanitary Type of Work:
None
Reuse Existing Side Sewer System:
Yes
SHORELINE MITIGATION SEQUENCE
Sequencing Required:
Yes