PERMIT APPLICATION COMMON
Where on your property are you working?:
NORTHWEST TOWNHOUSE (BLDG G, UNIT 25,26)
Is work in the right-of-way (street or alley) required?:
No
Choose the Primary Property Use:
Multifamily
Project Value:
439434
PERMIT TRACKING COMMON
Review Level:
Full C
Application Completed Date:
11/14/2017
Permit Issued Date:
05/05/2020
Inspections Completed Date:
08/26/2025
CONSTRUCTION VALUATION INFO
Intake Value: New:
439434
Intake Value: Alteration:
0
Total Intake Value:
439434
Issue Value: New:
439434
Issue Value: Alteration:
0
Total Issued Value:
439434
BUILDING CODE INFO
What building code was used for your design?:
2015 SRC
Is this a substantial alteration?:
No
Action Type:
New
Number of Proposed Building Stories:
3
Number of Proposed Below-Grade Building Stories:
0
Number of Mezzanines:
0
Will you change the building use or occupancy?:
Yes
Is a certificate of occupancy required?:
No
GROUND DISTURBANCE
Land Disturbing Activity:
Yes
Is your development site in an environmentally critical area (ECA)?:
No
I, the owner or owner’s authorized representative of the property referenced in this submission, give the City of Seattle Department of Planning and Development permission to conduct a Pre-Application Site Visit. I agree that: 1) electronic filing constitutes an authorizing signature; 2) I will inform all tenants of the site visit prior to the inspection being conducted; and 3) if conditions such as uncontrolled dogs or uncooperative tenants hinder the inspector’s ability to conduct the site visit, the site visit will not occur and the site visit fee may be forfeited.:
Yes
LAND USE STREET ELEMENTS
Number of Curb Cuts for This Permit:
0
PARKING
# of Proposed Onsite Parking:
8
Tenant Relocation Assistance
Residential Unit Occupancy:
Unit(s) on Property Not Affected by Scope
WASTE DIVERSION
Waste Diversion Plan Required:
Yes
MECHANICAL CODE
Does your project include an HVAC mechanical system?:
No
ENERGY CODE
Compliance Category:
Residential
Compliance Path:
Prescriptive
ENERGY EQUIPMENT
AFUE Efficiency (percentage):
0
HSPF Efficiency (percentage):
0
Heating Fuel Type Proposed: Residential:
Electric Heat Pump
SIDE SEWER INFORMATION
Related New Construction Project:
6621999
Temporary Dewatering for Construction:
No
Curb Crossing and/or Staging:
No
Excavation:
No
Curb and Sidewalk Restoration?:
No
Roadway Restoration:
No
DRAINAGE INFORMATION
Drainage Type of Work:
New
Number of New Drainage Connections to the Main:
1
Flow Control Type:
No Control
Flow Control Standard:
None
Treatment Standard Type:
Basic
Discharge Point:
Storm System
Total Disturbed Area:
11628
New Impervious Surface:
9166
New Plus Replaced Impervious Surface:
9166
Total Volume Managed by On-Site Stormwater Management (gallons):
119399
Total Area Requiring Soil Amendment:
2462
SANITARY INFORMATION
Sanitary Type of Work:
New
Number of New Connections to the Side Sewer:
1
Number of New Dwelling Units:
8
Reuse Existing Side Sewer System:
Yes