PERMIT APPLICATION COMMON
Where on your property are you working?:
WEST TOWNHOUSE
Is work in the right-of-way (street or alley) required?:
Yes
Choose the Primary Property Use:
Multifamily
Project Value:
552800
PERMIT TRACKING COMMON
Review Level:
Full C
Application Completed Date:
04/09/2018
Permit Issued Date:
05/08/2019
Inspections Completed Date:
07/30/2020
Certificate of Occupancy Issued Date:
07/30/2020
Permit Remarks:
Remove existing curb cut and restore curb along the west property line. Install and maintain one residential curb cut 10’ wide to be located along 29th Ave S and beginning approximately 5 feet north of the south property line.
CONSTRUCTION VALUATION INFO
Intake Value: New:
552800
Intake Value: Alteration:
0
Total Intake Value:
552800
Issue Value: New:
552800
Issue Value: Alteration:
0
Total Issued Value:
552800
Total Revision Value:
0
BUILDING CODE INFO
What building code was used for your design?:
2015 SBC
Is this a substantial alteration?:
No
Action Type:
New
Is this a high-rise?:
No
Will you change the building use or occupancy?:
Yes
Will your application include a new standard plan?:
No
Is a certificate of occupancy required?:
Yes
GROUND DISTURBANCE
Land Disturbing Activity:
Yes
I, the owner or owner’s authorized representative of the property referenced in this submission, give the City of Seattle Department of Planning and Development permission to conduct a Pre-Application Site Visit. I agree that: 1) electronic filing constitutes an authorizing signature; 2) I will inform all tenants of the site visit prior to the inspection being conducted; and 3) if conditions such as uncontrolled dogs or uncooperative tenants hinder the inspector’s ability to conduct the site visit, the site visit will not occur and the site visit fee may be forfeited.:
Yes
LAND USE STREET ELEMENTS
Number of Curb Cuts for This Permit:
1
Curb Cut Size and Location:
Remove existing curb cut and restore curb along the west property line. Install and maintain one residential curb cut 10’ wide to be located along 29th Ave S and beginning approximately 5 feet north of the south property line.
Tenant Relocation Assistance
Residential Unit Occupancy:
Unit(s) on Property Not Affected by Scope
WASTE DIVERSION
Waste Diversion Plan Required:
Yes
FIRE PROTECTION SYSTEMS
Sprinklers Meet NFPA 13:
No
Sprinklers Meet NFPA 13R:
No
Partial Fire Protection System:
No
Fire Alarm:
No
Other Fire Protection System:
No
EMERGENCY SYSTEMS
Are Emergency Systems Required for this Project?:
No
Exit and Pathway Lighting:
No
Smoke Removal System:
No
Accessible Elevator Egress:
No
MECHANICAL CODE
Does your project include an HVAC mechanical system?:
No
ENERGY CODE
Compliance Category:
Residential
Compliance Path:
Prescriptive
ENERGY EQUIPMENT
Heating Fuel Type Proposed: Residential:
Electric Resistance
Cooling Fuel Type Proposed: Residential:
Electric Heat Pump
DRAINAGE INFORMATION
Drainage Type of Work:
New
Number of New Drainage Connections to the Main:
1
Flow Control Type:
No Control
Flow Control Standard:
None
Treatment Standard Type:
No Treatment
Discharge Point:
Storm System
Total Disturbed Area:
6004
New Impervious Surface:
1628
New Plus Replaced Impervious Surface:
4849
Total Volume Managed by On-Site Stormwater Management (gallons):
47569
Total Area Requiring Soil Amendment:
1155
SANITARY INFORMATION
Sanitary Type of Work:
New
Number of New Connections to the Side Sewer:
1
Number of New Dwelling Units:
6
Reuse Existing Side Sewer System:
Yes