PERMIT APPLICATION COMMON
Is work in the right-of-way (street or alley) required?:
Yes
Choose the Primary Property Use:
Commercial
Project Value:
4300000
PERMIT TRACKING COMMON
Review Level:
Full C
Application Completed Date:
06/11/2018
Permit Issued Date:
06/26/2019
Permit Remarks:
Dewatering Plan deferred to a post-issuance revision. No ground disturbance allowed before approval.
CONSTRUCTION VALUATION INFO
Intake Value: New:
4300000
Intake Value: Alteration:
0
Total Intake Value:
4300000
Issue Value: New:
4300000
Issue Value: Alteration:
0
Total Issued Value:
4300000
BUILDING CODE INFO
What building code was used for your design?:
2015 SBC
Action Type:
New
Is a certificate of occupancy required?:
Yes
GROUND DISTURBANCE
Land Disturbing Activity:
Yes
Is your development site in an environmentally critical area (ECA)?:
Yes
LAND USE STREET ELEMENTS
Number of Curb Cuts for This Permit:
0
Tenant Relocation Assistance
Residential Unit Occupancy:
No Residential Units on Property
WASTE DIVERSION
Waste Diversion Plan Required:
Yes
MECHANICAL CODE
Does your project include an HVAC mechanical system?:
Yes
SIDE SEWER INFORMATION
Temporary Dewatering for Construction:
Yes
DRAINAGE INFORMATION
Number of Service Drain Lines Capped:
0
Drainage Type of Work:
None
Total Disturbed Area:
5135
New Impervious Surface:
0
New Plus Replaced Impervious Surface:
1931
Total Volume Managed by On-Site Stormwater Management (gallons):
0
Total Area Requiring Soil Amendment:
3204
SANITARY INFORMATION
Number of Service Sewer Lines Capped:
0
Sanitary Type of Work:
None
Reuse Existing Side Sewer System:
Yes