PERMIT APPLICATION COMMON
Is work in the right-of-way (street or alley) required?:
Yes
Choose the Primary Property Use:
Single Family/Duplex
Project Value:
383610
PERMIT TRACKING COMMON
Review Level:
Full +
Application Completed Date:
06/22/2018
Permit Issued Date:
07/13/2019
CONSTRUCTION VALUATION INFO
Intake Value: New:
383610
Intake Value: Alteration:
0
Total Intake Value:
383610
Issue Value: New:
395065
Issue Value: Alteration:
0
Total Issued Value:
395065
Total Revision Value:
0
BUILDING CODE INFO
What building code was used for your design?:
2015 SRC
Action Type:
New
Is a certificate of occupancy required?:
No
GROUND DISTURBANCE
Land Disturbing Activity:
Yes
Is your development site in an environmentally critical area (ECA)?:
No
I, the owner or owner’s authorized representative of the property referenced in this submission, give the City of Seattle Department of Planning and Development permission to conduct a Pre-Application Site Visit. I agree that: 1) electronic filing constitutes an authorizing signature; 2) I will inform all tenants of the site visit prior to the inspection being conducted; and 3) if conditions such as uncontrolled dogs or uncooperative tenants hinder the inspector’s ability to conduct the site visit, the site visit will not occur and the site visit fee may be forfeited.:
Yes
LAND USE STREET ELEMENTS
Number of Curb Cuts for This Permit:
1
Curb Cut Size and Location:
To construct and maintain one standard residential curb cut 10 feet wide. To be located along 20th Ave. NE approximately 5 feet north of the south property line. Portion of the existing curb cut will be replaced meeting SDOT standard.
Tenant Relocation Assistance
Residential Unit Occupancy:
Unit(s) Unoccupied
WASTE DIVERSION
Waste Diversion Plan Required:
No
MECHANICAL CODE
Does your project include an HVAC mechanical system?:
No
ENERGY CODE
Compliance Category:
Residential
Compliance Path:
Prescriptive
ENERGY EQUIPMENT
Heating Fuel Type Proposed: Residential:
Natural Gas
SIDE SEWER INFORMATION
Related New Construction Project:
6620564
Temporary Dewatering for Construction:
No
Pipe Lining in the Right-of-Way:
Yes
Side Sewer Conflict:
No
Side Sewer Conflict Description:
No
Is the system required by the Department of Ecology?:
No
DRAINAGE INFORMATION
Number of Service Drain Lines Capped:
0
Drainage Type of Work:
New
Number of Other New Drainage Connections:
1
Flow Control Type:
Infiltration
Flow Control Standard:
Pasture and Peak
Treatment Standard Type:
No Treatment
Discharge Point:
Other
Discharge Point Other Type:
Culvert
Total Disturbed Area:
8305
New Impervious Surface:
1200
New Plus Replaced Impervious Surface:
4520
Total Volume Managed by On-Site Stormwater Management (gallons):
127100
Total Area Requiring Soil Amendment:
3012
SANITARY INFORMATION
Number of Service Sewer Lines Capped:
0
Sanitary Type of Work:
New
Number of New Connections to the Side Sewer:
1
Number of New Dwelling Units:
1
Reuse Existing Side Sewer System:
Yes