PERMIT APPLICATION COMMON
Where on your property are you working?:
901 NW 51st St
Is work in the right-of-way (street or alley) required?:
Yes
Choose the Primary Property Use:
Multifamily
Project Value:
769470
PERMIT TRACKING COMMON
Review Level:
Full C
Application Completed Date:
03/20/2018
Permit Issued Date:
10/10/2018
Inspections Completed Date:
03/09/2022
Permit Remarks:
priority green expedited
CONSTRUCTION VALUATION INFO
Intake Value: New:
769470
Intake Value: Alteration:
0
Total Intake Value:
769470
Issue Value: New:
769470
Issue Value: Alteration:
0
Total Issued Value:
769470
BUILDING CODE INFO
What building code was used for your design?:
2015 SRC
Is this a substantial alteration?:
No
Action Type:
New
Will you change the building use or occupancy?:
Yes
Does your project qualify for our Priority Green Incentive program?:
Expedited
Is a certificate of occupancy required?:
No
GROUND DISTURBANCE
Land Disturbing Activity:
Yes
LAND USE STREET ELEMENTS
Number of Curb Cuts for This Permit:
0
Curb Cut Size and Location:
0
Tenant Relocation Assistance
Residential Unit Occupancy:
Residential Units on Property Not Affected by Scope
WASTE DIVERSION
Waste Diversion Plan Required:
Yes
MECHANICAL CODE
Does your project include an HVAC mechanical system?:
No
ENERGY CODE
Compliance Category:
Residential
Compliance Path:
Prescriptive
ENERGY EQUIPMENT
AFUE Efficiency (percentage):
0
HSPF Efficiency (percentage):
0
Heating Fuel Type Proposed: Residential:
Electric Heat Pump
Cooling Fuel Type Proposed: Residential:
Electric Heat Pump
Special Requirements:
Green Building with envelope 15% better than code. directors rule 20-2017 page 6 paragraph 3b states green building checklist satisfies this requirement.
SIDE SEWER INFORMATION
Related New Construction Project:
6617665
Temporary Dewatering for Construction:
No
Pipe Lining on Private Property:
Yes
Pipe Lining in the Right-of-Way:
Yes
DRAINAGE INFORMATION
Number of Service Drain Lines Capped:
0
Drainage Type of Work:
New
Number of New Drainage Connections to the Main:
1
Number of Other New Drainage Connections:
0
Number of Drainage New/Replaced/Repair Pumps:
0
Flow Control Type:
No Control
Flow Control Standard:
Peak
Treatment Standard Type:
No Treatment
Discharge Point:
Storm System
Total Disturbed Area:
4619
New Impervious Surface:
2100
New Plus Replaced Impervious Surface:
3639
Total Volume Managed by On-Site Stormwater Management (gallons):
67371
Total Area Requiring Soil Amendment:
980
SANITARY INFORMATION
Number of Service Sewer Lines Capped:
0
Sanitary Type of Work:
New
Number of New Sewer Connections to the Main:
0
Number of New Connections to the Side Sewer:
1
Number of Sewer New/Replaced/Repair Pumps:
0
Number of New Dwelling Units:
4
Reuse Existing Side Sewer System:
Yes