PERMIT APPLICATION COMMON
Where on your property are you working?:
Additions to West and Southwest portions of existing school building.
Is work in the right-of-way (street or alley) required?:
No
Choose the Primary Property Use:
Institutional
Project Value:
12954326
PERMIT TRACKING COMMON
Review Level:
Full C
Application Completed Date:
08/15/2018
Permit Issued Date:
06/25/2019
Inspections Completed Date:
08/25/2020
Certificate of Occupancy Issued Date:
08/25/2020
CONSTRUCTION VALUATION INFO
Intake Value: New:
2482120
Intake Value: Alteration:
10472206
Total Intake Value:
12954326
Issue Value: New:
2679703
Issue Value: Alteration:
10274623
Total Issued Value:
12954326
BUILDING CODE INFO
What building code was used for your design?:
2015 SEBC
Is this a substantial alteration?:
Yes
Action Type:
Add/Alt
Number of Existing Building Stories:
2
Number of Existing Below-Grade Building Stories:
1
Number of Proposed Building Stories:
2
Number of Proposed Below-Grade Building Stories:
1
Will you change the building use or occupancy?:
Yes
Is a certificate of occupancy required?:
Yes
GROUND DISTURBANCE
Land Disturbing Activity:
Yes
Is your development site in an environmentally critical area (ECA)?:
No
I, the owner or owner’s authorized representative of the property referenced in this submission, give the City of Seattle Department of Planning and Development permission to conduct a Pre-Application Site Visit. I agree that: 1) electronic filing constitutes an authorizing signature; 2) I will inform all tenants of the site visit prior to the inspection being conducted; and 3) if conditions such as uncontrolled dogs or uncooperative tenants hinder the inspector’s ability to conduct the site visit, the site visit will not occur and the site visit fee may be forfeited.:
Yes
LAND USE STREET ELEMENTS
Number of Curb Cuts for This Permit:
0
Curb Cut Size and Location:
0
Tenant Relocation Assistance
Residential Unit Occupancy:
No Units on Property
WASTE DIVERSION
Waste Diversion Plan Required:
Yes
FIRE PROTECTION SYSTEMS
Sprinklers Meet NFPA 13:
Yes
MECHANICAL CODE
Does your project include an HVAC mechanical system?:
Yes
MECHANICAL DUCTWORK LOCATION
Is there any rooftop equipment? :
Yes
ENERGY CODE
Compliance Category:
Commercial
Compliance Path:
Component Performance
Is there a commercial kitchen hood exhaust system?:
Yes
ENERGY EQUIPMENT
Heating Fuel Type Proposed: Non-Residential:
Other
Special Requirements:
C411 using exception 2 heat recovery
DRAINAGE INFORMATION
Number of Service Drain Lines Capped:
0
Drainage Type of Work:
Addition/Alteration
Number of New Drainage Connections to the Main:
0
Number of Other New Drainage Connections:
1
Number of Drainage New/Replaced/Repair Pumps:
1
Flow Control Type:
Pipe
Flow Control Standard:
Peak
Treatment Standard Type:
No Treatment
Discharge Point:
Combined System
Total Disturbed Area:
59315
New Impervious Surface:
0
New Plus Replaced Impervious Surface:
44300
Total Volume Managed by On-Site Stormwater Management (gallons):
64545
Total Area Requiring Soil Amendment:
15015
SANITARY INFORMATION
Number of Service Sewer Lines Capped:
0
Sanitary Type of Work:
New
Number of New Sewer Connections to the Main:
1
Number of New Connections to the Side Sewer:
1
Number of Sewer New/Replaced/Repair Pumps:
0
Number of New Dwelling Units:
0
Reuse Existing Side Sewer System:
Yes