PERMIT APPLICATION COMMON
Is work in the right-of-way (street or alley) required?:
Yes
Choose the Primary Property Use:
Commercial
Project Value:
6975108
PERMIT TRACKING COMMON
Review Level:
Full C
Application Completed Date:
09/21/2018
Permit Issued Date:
06/15/2020
Inspections Completed Date:
10/14/2021
Certificate of Occupancy Issued Date:
10/14/2021
Permit Remarks:
12-foot curbcut located on 39th Ave S roughly 30-feet north of the SW property corner.
24-foot curbcut located on S Holly Park Drive located at the middle of the site.
FLOATING RESIDENCE INFO
Is this building a Floating Residence?:
No
CONSTRUCTION VALUATION INFO
Intake Value: New:
6975108
Intake Value: Alteration:
0
Total Intake Value:
6975108
Issue Value: New:
7341231
Issue Value: Alteration:
0
Total Issued Value:
7341231
BUILDING CODE INFO
What building code was used for your design?:
2015 SBC
Action Type:
New
Number of Proposed Building Stories:
3
Number of Proposed Below-Grade Building Stories:
0
Number of Mezzanines:
0
Is this a high-rise?:
No
Will you change the building use or occupancy?:
Yes
Is a certificate of occupancy required?:
Yes
GROUND DISTURBANCE
Land Disturbing Activity:
Yes
Is your development site in an environmentally critical area (ECA)?:
No
Are you doing more than 2,000 square feet of earth disturbance?:
More than 750 square feet
I, the owner or owner’s authorized representative of the property referenced in this submission, give the City of Seattle Department of Planning and Development permission to conduct a Pre-Application Site Visit. I agree that: 1) electronic filing constitutes an authorizing signature; 2) I will inform all tenants of the site visit prior to the inspection being conducted; and 3) if conditions such as uncontrolled dogs or uncooperative tenants hinder the inspector’s ability to conduct the site visit, the site visit will not occur and the site visit fee may be forfeited.:
Yes
LAND USE STREET ELEMENTS
Number of Curb Cuts for This Permit:
2
Curb Cut Size and Location:
15-foot curbcut located 36.-5 feet north of the SW property corner.
17'6" curbcut located 95.8' east of the SE property corner.
PARKING
# of Existing Onsite Parking:
0
# of Existing Offsite Parking:
0
# of Existing Accessible Parking:
0
# of Proposed Onsite Parking:
9
# of Proposed Offsite Parking:
0
# of Proposed Accessible Parking:
1
# of Existing Bicycle Parking Spots:
0
# of Proposed Bicycle Parking Spots:
66
Tenant Relocation Assistance
Residential Unit Occupancy:
No Units on Property
WASTE DIVERSION
Waste Diversion Plan Required:
Yes
FIRE PROTECTION SYSTEMS
Sprinklers Meet NFPA 13:
Yes
EMERGENCY SYSTEMS
Are Emergency Systems Required for this Project?:
No
MECHANICAL CODE
Does your project include an HVAC mechanical system?:
Yes
ENERGY CODE
Compliance Category:
Commercial
Compliance Path:
Prescriptive
Is there a commercial kitchen hood exhaust system?:
No
Is there a fume hood?:
Yes
Is there a spray paint booth?:
No
ENERGY EQUIPMENT
Heating Fuel Type Proposed: Non-Residential:
Electric Heat Pump
Cooling Fuel Type Proposed: Non-Residential:
Electric Heat Pump
DRAINAGE INFORMATION
Number of Service Drain Lines Capped:
2
Drainage Type of Work:
New
Number of New Drainage Connections to the Main:
1
Flow Control Type:
No Control
Flow Control Standard:
None
Treatment Standard Type:
No Treatment
Discharge Point:
Storm System
Total Disturbed Area:
27025
New Impervious Surface:
0
New Plus Replaced Impervious Surface:
21044
Total Volume Managed by On-Site Stormwater Management (gallons):
155839
Total Area Requiring Soil Amendment:
5981
SANITARY INFORMATION
Number of Service Sewer Lines Capped:
2
Sanitary Type of Work:
New
Number of New Sewer Connections to the Main:
2
Reuse Existing Side Sewer System:
No
SANITARY INFORMATION
Number of New Dwelling Units:
0