PERMIT APPLICATION COMMON
Is work in the right-of-way (street or alley) required?:
Yes
Choose the Primary Property Use:
Multifamily
Project Value:
760798
PERMIT TRACKING COMMON
Review Level:
Full C
Application Completed Date:
12/07/2017
Permit Issued Date:
10/10/2018
Inspections Completed Date:
02/01/2021
Certificate of Occupancy Issued Date:
02/03/2021
Permit Remarks:
To construct and maintain one standard ten foot wide curb cut located approximately 40 feet west of the east property line. Existing curb cut to be restored to curb per SDOT standards.
CONSTRUCTION VALUATION INFO
Intake Value: New:
760798
Intake Value: Alteration:
0
Total Intake Value:
760798
Issue Value: New:
760798
Issue Value: Alteration:
0
Total Issued Value:
760798
BUILDING CODE INFO
What building code was used for your design?:
2015 SBC
Is this a substantial alteration?:
No
Action Type:
New
Number of Proposed Building Stories:
3
Number of Proposed Below-Grade Building Stories:
1
Will you change the building use or occupancy?:
Yes
Is a certificate of occupancy required?:
Yes
GROUND DISTURBANCE
Land Disturbing Activity:
Yes
LAND USE STREET ELEMENTS
Number of Curb Cuts for This Permit:
1
Curb Cut Size and Location:
To construct and maintain one standard ten foot wide curb cut along East Cherry Street located approximately 40 feet west of the east property line. Existing curb cuts to be restored to curb per SDOT standards.
Tenant Relocation Assistance
Residential Unit Occupancy:
Residential Units on Property Not Affected by Scope
WASTE DIVERSION
Waste Diversion Plan Required:
Yes
EMERGENCY SYSTEMS
Are Emergency Systems Required for this Project?:
No
MECHANICAL CODE
Does your project include an HVAC mechanical system?:
No
ENERGY CODE
Compliance Category:
Residential
Compliance Path:
Prescriptive
ENERGY EQUIPMENT
AFUE Efficiency (percentage):
0
HSPF Efficiency (percentage):
0
Heating Fuel Type Proposed: Residential:
Electric Heat Pump
SIDE SEWER INFORMATION
Pipe Lining in the Right-of-Way:
No
Curb Crossing and/or Staging:
No
Excavation:
No
Roadway Restoration:
No
DRAINAGE INFORMATION
Number of Service Drain Lines Capped:
0
Drainage Type of Work:
New
Number of New Drainage Connections to the Main:
0
Number of Other New Drainage Connections:
1
Number of Drainage New/Replaced/Repair Pumps:
0
Flow Control Type:
No Control
Flow Control Standard:
Peak
Treatment Standard Type:
No Treatment
Discharge Point:
Combined System
Total Disturbed Area:
3600
New Impervious Surface:
0
New Plus Replaced Impervious Surface:
2495
Total Volume Managed by On-Site Stormwater Management (gallons):
21212
Total Area Requiring Soil Amendment:
1105
SANITARY INFORMATION
Number of Service Sewer Lines Capped:
0
Sanitary Type of Work:
New
Number of New Sewer Connections to the Main:
0
Number of New Connections to the Side Sewer:
1
Number of Sewer New/Replaced/Repair Pumps:
0
Reuse Existing Side Sewer System:
Yes
GROUND DISTURBANCE
Is the ground disturbance in an environmentally critical area?:
No
PARKING
Number of Existing Onsite Parking Spaces:
0
Number of Existing Offsite Parking Spaces:
0
Number of Existing Accessible Parking Spaces:
0
Number of Proposed Onsite Parking Spaces:
4
Number of Proposed Offsite Parking Spaces:
0
Offsite Parking Location:
none
Number of Proposed Accessible Parking Spaces:
0
Number of Existing Bicycle Parking Spots:
0
Number of Proposed Bicycle Parking Spots:
4