PERMIT APPLICATION COMMON
Is work in the right-of-way (street or alley) required?:
Yes
Choose the Primary Property Use:
Multifamily
Project Value:
1830940
PERMIT TRACKING COMMON
Review Level:
Full C
Application Completed Date:
04/06/2018
Permit Issued Date:
02/11/2020
Inspections Completed Date:
11/01/2024
CONSTRUCTION VALUATION INFO
Intake Value: New:
1830940
Intake Value: Alteration:
0
Total Intake Value:
1830940
Issue Value: New:
0
Issue Value: Alteration:
0
Total Issued Value:
0
BUILDING CODE INFO
What building code was used for your design?:
2015 SRC
Is this a substantial alteration?:
No
Action Type:
New
Number of Proposed Building Stories:
3
Number of Proposed Below-Grade Building Stories:
1
Number of Mezzanines:
0
Will you change the building use or occupancy?:
No
Is a certificate of occupancy required?:
No
GROUND DISTURBANCE
Land Disturbing Activity:
Yes
Is your development site in an environmentally critical area (ECA)?:
No
I, the owner or owner’s authorized representative of the property referenced in this submission, give the City of Seattle Department of Planning and Development permission to conduct a Pre-Application Site Visit. I agree that: 1) electronic filing constitutes an authorizing signature; 2) I will inform all tenants of the site visit prior to the inspection being conducted; and 3) if conditions such as uncontrolled dogs or uncooperative tenants hinder the inspector’s ability to conduct the site visit, the site visit will not occur and the site visit fee may be forfeited.:
Yes
LAND USE STREET ELEMENTS
Number of Curb Cuts for This Permit:
1
Curb Cut Size and Location:
12 foot curbcut in the NW corner of the property directly abutting E Lynn St.
PARKING
# of Proposed Onsite Parking:
5
# of Proposed Offsite Parking:
1
Offsite Parking Location:
Across driveway at the rear of the lot.
# of Proposed Bicycle Parking Spots:
0
Tenant Relocation Assistance
Residential Unit Occupancy:
All Residential Units Occupied by Property Owner
WASTE DIVERSION
Waste Diversion Plan Required:
Yes
MECHANICAL CODE
Does your project include an HVAC mechanical system?:
No
ENERGY CODE
Compliance Category:
Residential
Compliance Path:
Prescriptive
ENERGY EQUIPMENT
Heating Fuel Type Proposed: Residential:
Electric Heat Pump
SIDE SEWER INFORMATION
Temporary Dewatering for Construction:
No
DRAINAGE INFORMATION
Number of Service Drain Lines Capped:
0
Drainage Type of Work:
New
Number of New Drainage Connections to the Main:
1
Number of Other New Drainage Connections:
0
Number of Drainage New/Replaced/Repair Pumps:
1
Flow Control Type:
No Control
Flow Control Standard:
None
Treatment Standard Type:
Basic
Discharge Point:
Storm System
Discharge Point Other Type:
Combined Sewer Overflow Storm
Total Disturbed Area:
6972
New Impervious Surface:
1570
New Plus Replaced Impervious Surface:
6070
Total Volume Managed by On-Site Stormwater Management (gallons):
49059
Total Area Requiring Soil Amendment:
902
SANITARY INFORMATION
Number of Service Sewer Lines Capped:
1
Sanitary Type of Work:
New
Number of New Sewer Connections to the Main:
0
Number of New Connections to the Side Sewer:
1
Number of Sewer New/Replaced/Repair Pumps:
1
Number of New Dwelling Units:
7
Reuse Existing Side Sewer System:
Yes