PERMIT APPLICATION COMMON
Is work in the right-of-way (street or alley) required?:
Yes
Choose the Primary Property Use:
Single Family/Duplex
Project Value:
958322
PERMIT TRACKING COMMON
Review Level:
Full C
Application Completed Date:
11/28/2017
Permit Issued Date:
06/13/2018
Inspections Completed Date:
10/15/2019
CONSTRUCTION VALUATION INFO
Intake Value: New:
958322
Intake Value: Alteration:
0
Total Intake Value:
958322
Issue Value: New:
958322
Issue Value: Alteration:
0
Total Issued Value:
958322
BUILDING CODE INFO
What building code was used for your design?:
2015 SBC
Is this a substantial alteration?:
No
Action Type:
New
Will you change the building use or occupancy?:
No
Is a certificate of occupancy required?:
Yes
GROUND DISTURBANCE
Land Disturbing Activity:
Yes
I, the owner or owner’s authorized representative of the property referenced in this submission, give the City of Seattle Department of Planning and Development permission to conduct a Pre-Application Site Visit. I agree that: 1) electronic filing constitutes an authorizing signature; 2) I will inform all tenants of the site visit prior to the inspection being conducted; and 3) if conditions such as uncontrolled dogs or uncooperative tenants hinder the inspector’s ability to conduct the site visit, the site visit will not occur and the site visit fee may be forfeited.:
Yes
LAND USE STREET ELEMENTS
Number of Curb Cuts for This Permit:
0
PARKING
# of Existing Onsite Parking:
2
# of Existing Offsite Parking:
0
# of Existing Accessible Parking:
0
# of Proposed Onsite Parking:
5
# of Proposed Offsite Parking:
0
Offsite Parking Location:
n/a
# of Proposed Accessible Parking:
0
# of Existing Bicycle Parking Spots:
0
Tenant Relocation Assistance
Residential Unit Occupancy:
Unit(s) on Property Not Affected by Scope
WASTE DIVERSION
Waste Diversion Plan Required:
Yes
MECHANICAL CODE
Does your project include an HVAC mechanical system?:
No
ENERGY CODE
Compliance Category:
Residential
Compliance Path:
Prescriptive
ENERGY EQUIPMENT
AFUE Efficiency (percentage):
0
HSPF Efficiency (percentage):
0
Heating Fuel Type Proposed: Residential:
Electric Heat Pump
DRAINAGE INFORMATION
Drainage Type of Work:
New
Number of Other New Drainage Connections:
1
Flow Control Type:
No Control
Flow Control Standard:
Peak
Treatment Standard Type:
No Treatment
Discharge Point:
Other
Discharge Point Other Type:
FORMERLY COMBINED
Total Disturbed Area:
5483
New Impervious Surface:
1187
New Plus Replaced Impervious Surface:
4730
Total Volume Managed by On-Site Stormwater Management (gallons):
73057
Total Area Requiring Soil Amendment:
753
SANITARY INFORMATION
Sanitary Type of Work:
New
Number of New Connections to the Side Sewer:
1
Number of New Dwelling Units:
5
Reuse Existing Side Sewer System:
Yes