PERMIT APPLICATION COMMON
Where on your property are you working?:
CHANGED ADDRESS ON A/P FROM 801 NW 63RD ST. SLM 8/31/17
Is work in the right-of-way (street or alley) required?:
No
Choose the Primary Property Use:
Multifamily
Project Value:
1160532
PERMIT TRACKING COMMON
Review Level:
Full C
Application Completed Date:
09/16/2017
Permit Issued Date:
02/22/2019
Inspections Completed Date:
05/06/2020
Certificate of Occupancy Issued Date:
05/06/2020
CONSTRUCTION VALUATION INFO
Intake Value: New:
1160532
Intake Value: Alteration:
0
Total Intake Value:
1160532
Issue Value: New:
1160532
Issue Value: Alteration:
0
Total Issued Value:
1160532
BUILDING CODE INFO
What building code was used for your design?:
2015 SBC
Is this a substantial alteration?:
No
Action Type:
New
Will you change the building use or occupancy?:
No
Is a certificate of occupancy required?:
Yes
GROUND DISTURBANCE
Land Disturbing Activity:
Yes
Is your development site in an environmentally critical area (ECA)?:
Yes
I, the owner or owner’s authorized representative of the property referenced in this submission, give the City of Seattle Department of Planning and Development permission to conduct a Pre-Application Site Visit. I agree that: 1) electronic filing constitutes an authorizing signature; 2) I will inform all tenants of the site visit prior to the inspection being conducted; and 3) if conditions such as uncontrolled dogs or uncooperative tenants hinder the inspector’s ability to conduct the site visit, the site visit will not occur and the site visit fee may be forfeited.:
Yes
LAND USE STREET ELEMENTS
Number of Curb Cuts for This Permit:
1
Curb Cut Size and Location:
To permit 10' curb cut along NW 63rd St, approx. 3' from west property line
Tenant Relocation Assistance
Residential Unit Occupancy:
Unit(s) on Property Not Affected by Scope
WASTE DIVERSION
Waste Diversion Plan Required:
Yes
MECHANICAL CODE
Does your project include an HVAC mechanical system?:
No
ENERGY CODE
Compliance Category:
Residential
Compliance Path:
Prescriptive
ENERGY EQUIPMENT
AFUE Efficiency (percentage):
0
HSPF Efficiency (percentage):
0
Heating Fuel Type Proposed: Residential:
Natural Gas
DRAINAGE INFORMATION
Number of Service Drain Lines Capped:
0
Drainage Type of Work:
New
Number of New Drainage Connections to the Main:
1
Number of Other New Drainage Connections:
0
Number of Drainage New/Replaced/Repair Pumps:
0
Flow Control Type:
No Control
Flow Control Standard:
Peak
Treatment Standard Type:
No Treatment
Discharge Point:
Storm System
Total Disturbed Area:
5252
New Impervious Surface:
2670
New Plus Replaced Impervious Surface:
4628
Total Volume Managed by On-Site Stormwater Management (gallons):
71657
Total Area Requiring Soil Amendment:
624
SANITARY INFORMATION
Number of Service Sewer Lines Capped:
0
Sanitary Type of Work:
New
Number of New Sewer Connections to the Main:
0
Number of New Connections to the Side Sewer:
1
Number of Sewer New/Replaced/Repair Pumps:
0
Number of New Dwelling Units:
8
Reuse Existing Side Sewer System:
Yes