PERMIT APPLICATION COMMON
Is work in the right-of-way (street or alley) required?:
No
Choose the Primary Property Use:
Institutional
Project Value:
23055000
PERMIT TRACKING COMMON
Review Level:
Full C
Application Completed Date:
10/25/2017
Permit Issued Date:
07/02/2018
Inspections Completed Date:
11/20/2019
Certificate of Occupancy Issued Date:
12/20/2019
CONSTRUCTION VALUATION INFO
Intake Value: New:
8638315
Intake Value: Alteration:
14416685
Total Intake Value:
23055000
Issue Value: New:
23055000
Issue Value: Alteration:
0
Total Issued Value:
23055000
BUILDING CODE INFO
What building code was used for your design?:
2015 SBC
Specific Building Code:
SEBC Perscriptive
Is this a substantial alteration?:
No
Action Type:
Add/Alt
Number of Existing Building Stories:
2
Number of Existing Below-Grade Building Stories:
0
Number of Proposed Building Stories:
2
Number of Proposed Below-Grade Building Stories:
0
Number of Mezzanines:
0
Will you change the building use or occupancy?:
Yes
Main Existing Use of Building:
Institutional
Is a certificate of occupancy required?:
Yes
GROUND DISTURBANCE
Land Disturbing Activity:
Yes
Is your development site in an environmentally critical area (ECA)?:
No
LAND USE STREET ELEMENTS
Number of Curb Cuts for This Permit:
0
Curb Cut Size and Location:
none
Tenant Relocation Assistance
Residential Unit Occupancy:
Unit(s) on Property Not Affected by Scope
WASTE DIVERSION
Waste Diversion Plan Required:
Yes
FIRE PROTECTION SYSTEMS
Sprinklers Meet NFPA 13:
Yes
EMERGENCY SYSTEMS
Are Emergency Systems Required for this Project?:
No
MECHANICAL CODE
Does your project include an HVAC mechanical system?:
Yes
ENERGY CODE
Compliance Category:
Commercial
Compliance Path:
Prescriptive
ENERGY EQUIPMENT
Heating Fuel Type Proposed: Non-Residential:
Natural Gas
Special Requirements:
C411 exception 2 (i.e. additional heat recovery)
SIDE SEWER INFORMATION
Related New Construction Project:
6583445
Temporary Dewatering for Construction:
No
DRAINAGE INFORMATION
Number of Service Drain Lines Capped:
0
Drainage Type of Work:
New
Number of New Drainage Connections to the Main:
0
Number of Other New Drainage Connections:
1
Number of Drainage New/Replaced/Repair Pumps:
0
Flow Control Type:
Bio-Engineer
Flow Control Standard:
Peak
Treatment Standard Type:
No Treatment
Discharge Point:
Storm System
Total Disturbed Area:
45499
New Impervious Surface:
33641
New Plus Replaced Impervious Surface:
33641
Total Volume Managed by On-Site Stormwater Management (gallons):
263571
Total Area Requiring Soil Amendment:
11612
SANITARY INFORMATION
Number of Service Sewer Lines Capped:
0
Sanitary Type of Work:
New
Number of New Sewer Connections to the Main:
0
Number of New Connections to the Side Sewer:
1
Number of Sewer New/Replaced/Repair Pumps:
1
Number of New Dwelling Units:
0
Reuse Existing Side Sewer System:
Yes