PERMIT APPLICATION COMMON
Where on your property are you working?:
6/27/18:A.M.: ADDRESS CHANGED FROM 225 ROY ST TO 205 ROY ST(BLDG 'A')-(MAIN RES ENTRY)-See DV0090354 for tenant address assignments
Is work in the right-of-way (street or alley) required?:
No
Choose the Primary Property Use:
Commercial
Project Value:
18572739
PERMIT TRACKING COMMON
Review Level:
Full C
Application Completed Date:
12/11/2017
Permit Issued Date:
11/06/2018
Inspections Completed Date:
02/04/2021
Certificate of Occupancy Issued Date:
02/04/2021
CONSTRUCTION VALUATION INFO
Intake Value: New:
18572739
Intake Value: Alteration:
0
Total Intake Value:
18572739
Issue Value: New:
19727479
Issue Value: Alteration:
0
Total Issued Value:
19727479
BUILDING CODE INFO
What building code was used for your design?:
2015 SBC
Is this a substantial alteration?:
No
Action Type:
New
Number of Proposed Building Stories:
7
Number of Proposed Below-Grade Building Stories:
2
Is this a high-rise?:
No
Will you change the building use or occupancy?:
Yes
Is a certificate of occupancy required?:
Yes
GROUND DISTURBANCE
Land Disturbing Activity:
Yes
I, the owner or owner’s authorized representative of the property referenced in this submission, give the City of Seattle Department of Planning and Development permission to conduct a Pre-Application Site Visit. I agree that: 1) electronic filing constitutes an authorizing signature; 2) I will inform all tenants of the site visit prior to the inspection being conducted; and 3) if conditions such as uncontrolled dogs or uncooperative tenants hinder the inspector’s ability to conduct the site visit, the site visit will not occur and the site visit fee may be forfeited.:
Yes
LAND USE STREET ELEMENTS
Number of Curb Cuts for This Permit:
0
Curb Cut Size and Location:
One curb cut, 24' wide, located along 3rd Ave N approx. 117' from the north property line.
Tenant Relocation Assistance
Residential Unit Occupancy:
Residential Units on Property Not Affected by Scope
WASTE DIVERSION
Waste Diversion Plan Required:
Yes
EMERGENCY SYSTEMS
Are Emergency Systems Required for this Project?:
Yes
Elevator Pressurization:
Yes
Stairway Pressurization:
Yes
Emergency Generator:
No
Accessible Elevator Egress:
Yes
MECHANICAL CODE
Does your project include an HVAC mechanical system?:
Yes
ENERGY CODE
Compliance Category:
Residential
Compliance Path:
Component Performance
ENERGY EQUIPMENT
AFUE Efficiency (percentage):
0
HSPF Efficiency (percentage):
0
Heating Fuel Type Proposed: Residential:
Electric Heat Pump
Cooling Fuel Type Proposed: Residential:
Electric Heat Pump
SIDE SEWER INFORMATION
Related New Construction Project:
6580293
DRAINAGE INFORMATION
Number of Service Drain Lines Capped:
0
Drainage Type of Work:
New
Number of New Drainage Connections to the Main:
0
Number of Other New Drainage Connections:
1
Number of Drainage New/Replaced/Repair Pumps:
1
Flow Control Type:
Vault
Flow Control Standard:
Peak
Treatment Standard Type:
No Treatment
Discharge Point:
Combined System
Total Disturbed Area:
45920
New Impervious Surface:
0
New Plus Replaced Impervious Surface:
43970
Total Volume Managed by On-Site Stormwater Management (gallons):
213608
Total Area Requiring Soil Amendment:
1950
SANITARY INFORMATION
Number of Service Sewer Lines Capped:
3
Sanitary Type of Work:
New
Number of New Sewer Connections to the Main:
2
Number of New Connections to the Side Sewer:
2
Number of Sewer New/Replaced/Repair Pumps:
0
Reuse Existing Side Sewer System:
No
GROUND DISTURBANCE
Is the ground disturbance in an environmentally critical area?:
No