PERMIT APPLICATION COMMON
Is work in the right-of-way (street or alley) required?:
No
Choose the Primary Property Use:
Multifamily
Project Value:
3500000
PERMIT TRACKING COMMON
Review Level:
Full C
Application Completed Date:
10/11/2017
Permit Issued Date:
08/22/2018
Inspections Completed Date:
12/02/2020
Certificate of Occupancy Issued Date:
12/02/2020
CONSTRUCTION VALUATION INFO
Intake Value: New:
565768
Intake Value: Alteration:
2934232
Total Intake Value:
3500000
Issue Value: New:
2120001
Issue Value: Alteration:
884558
Total Issued Value:
3004559
Total Revision Value:
2826674
BUILDING CODE INFO
What building code was used for your design?:
2015 SEBC
Specific Building Code:
SEBC Perscriptive
Is this a substantial alteration?:
Yes
Action Type:
Add/Alt
Will you change the building use or occupancy?:
Yes
Is a certificate of occupancy required?:
Yes
GROUND DISTURBANCE
Land Disturbing Activity:
Yes
Is your development site in an environmentally critical area (ECA)?:
No
I, the owner or owner’s authorized representative of the property referenced in this submission, give the City of Seattle Department of Planning and Development permission to conduct a Pre-Application Site Visit. I agree that: 1) electronic filing constitutes an authorizing signature; 2) I will inform all tenants of the site visit prior to the inspection being conducted; and 3) if conditions such as uncontrolled dogs or uncooperative tenants hinder the inspector’s ability to conduct the site visit, the site visit will not occur and the site visit fee may be forfeited.:
Yes
LAND USE STREET ELEMENTS
Number of Curb Cuts for This Permit:
0
Tenant Relocation Assistance
Residential Unit Occupancy:
Unit(s) on Property Not Affected by Scope
WASTE DIVERSION
Waste Diversion Plan Required:
Yes
MECHANICAL CODE
Does your project include an HVAC mechanical system?:
No
ENERGY CODE
Compliance Category:
Commercial
Compliance Path:
Prescriptive
ENERGY EQUIPMENT
AFUE Efficiency (percentage):
0
HSPF Efficiency (percentage):
0
Heating Fuel Type Proposed: Non-Residential:
Electric Heat Pump
Cooling Fuel Type Proposed: Non-Residential:
Electric Heat Pump
Special Requirements:
SEC C411: PV
SIDE SEWER INFORMATION
Related New Construction Project:
6570133
DRAINAGE INFORMATION
Number of Service Drain Lines Capped:
0
Drainage Type of Work:
New
Number of New Drainage Connections to the Main:
0
Number of Other New Drainage Connections:
1
Number of Drainage New/Replaced/Repair Pumps:
0
Flow Control Type:
Vault
Flow Control Standard:
Peak
Treatment Standard Type:
No Treatment
Discharge Point:
Other
Discharge Point Other Type:
Sanitary Sewer in Alley
Total Disturbed Area:
5386
New Impervious Surface:
900
New Plus Replaced Impervious Surface:
4979
Total Volume Managed by On-Site Stormwater Management (gallons):
22032
Total Area Requiring Soil Amendment:
407
SANITARY INFORMATION
Number of Service Sewer Lines Capped:
0
Sanitary Type of Work:
New
Number of New Sewer Connections to the Main:
0
Number of New Connections to the Side Sewer:
1
Number of Sewer New/Replaced/Repair Pumps:
0
Reuse Existing Side Sewer System:
Yes
BUILDING CODE INFO
Are you changing the envelope?:
Yes
Number of Existing Building Stories:
1
Number of Existing Below-Grade Building Stories:
1
Number of Proposed Building Stories:
4
Number of Proposed Below-Grade Building Stories:
1
Number of Mezzanines:
0
Is this a high-rise?:
No
Existing Use:
Business
Existing Occupancy:
B Office
Will your application include a new standard plan?:
No