PERMIT APPLICATION COMMON
Choose the Primary Property Use:
Institutional
Project Value:
1200000
PERMIT TRACKING COMMON
Review Level:
Full +
Application Completed Date:
06/27/2016
Permit Issued Date:
12/14/2016
Permit Remarks:
No mechanical this permit except for geothermal bores installation.
CONSTRUCTION VALUATION INFO
Intake Value: New:
0
Intake Value: Alteration:
1200000
Total Intake Value:
1200000
Issue Value: New:
1200000
Issue Value: Alteration:
0
Total Issued Value:
1200000
BUILDING CODE INFO
What building code was used for your design?:
2012 SBC
Specific Building Code:
2012 SBC
Is this a substantial alteration?:
No
Action Type:
Add/Alt
Will you change the building use or occupancy?:
No
Is a certificate of occupancy required?:
No
GROUND DISTURBANCE
Land Disturbing Activity:
Yes
Are you doing more than 2,000 square feet of earth disturbance?:
Yes
I, the owner or owner’s authorized representative of the property referenced in this submission, give the City of Seattle Department of Planning and Development permission to conduct a Pre-Application Site Visit. I agree that: 1) electronic filing constitutes an authorizing signature; 2) I will inform all tenants of the site visit prior to the inspection being conducted; and 3) if conditions such as uncontrolled dogs or uncooperative tenants hinder the inspector’s ability to conduct the site visit, the site visit will not occur and the site visit fee may be forfeited.:
Yes
LAND USE STREET ELEMENTS
Number of Curb Cuts for This Permit:
0
Tenant Relocation Assistance
Residential Unit Occupancy:
Residential Units on Property Not Affected by Scope
WASTE DIVERSION
Waste Diversion Plan Required:
Yes
FIRE PROTECTION SYSTEMS
Sprinklers Meet NFPA 13:
Yes
EMERGENCY SYSTEMS
Are Emergency Systems Required for this Project?:
No
MECHANICAL CODE
Does your project include an HVAC mechanical system?:
No
SIDE SEWER INFORMATION
Pipe Lining in the Right-of-Way:
No
Curb Crossing and/or Staging:
No
Excavation:
No
Roadway Restoration:
No
DRAINAGE INFORMATION
Number of Service Drain Lines Capped:
0
Drainage Type of Work:
New
Number of New Drainage Connections to the Main:
1
Number of Other New Drainage Connections:
0
Number of Drainage New/Replaced/Repair Pumps:
0
Flow Control Type:
Infiltration
Flow Control Standard:
Peak
Treatment Standard Type:
No Treatment
Discharge Point:
Combined System
Total Disturbed Area:
87596
New Impervious Surface:
0
New Plus Replaced Impervious Surface:
83364
Total Volume Managed by On-Site Stormwater Management (gallons):
622366
Total Area Requiring Soil Amendment:
4232
SANITARY INFORMATION
Number of Service Sewer Lines Capped:
0
Sanitary Type of Work:
New
Number of New Sewer Connections to the Main:
1
Number of New Connections to the Side Sewer:
0
Number of Sewer New/Replaced/Repair Pumps:
0
Reuse Existing Side Sewer System:
No