PERMIT APPLICATION COMMON
Where on your property are you working?:
SEDIMENTATION, DISINFECT & HOLDING TANK BUILDING
Choose the Primary Property Use:
Commercial
Project Value:
681163
PERMIT TRACKING COMMON
Review Level:
Full C
Application Completed Date:
12/27/2016
Permit Issued Date:
06/14/2017
Inspections Completed Date:
03/27/2023
Certificate of Occupancy Issued Date:
03/27/2023
Permit Remarks:
NO PRE-CONSTRUCTION MEETING CAN BE SCHEDULED AND NO EARTHWORK MAY BE PERFORMED FOR THIS PROJECT PRIOR TO ISSUANCE OF A PERMIT REVISION FOR SHORING, DEWATERING, AND MANAGING CONTAMINATED SOILS AND GROUNDWATER. THE SHORING AND DEWATERING PLANS AND PLANS FOR MANAGING CONTAMINATED SOILS AND GROUNDWATER SHOWN IN THIS PLAN SET (6503485) ARE CONCEPTUAL ONLY.
CONSTRUCTION VALUATION INFO
Intake Value: New:
681163
Intake Value: Alteration:
0
Total Intake Value:
681163
Issue Value: New:
681163
Issue Value: Alteration:
0
Total Issued Value:
681163
BUILDING CODE INFO
What building code was used for your design?:
2012 SBC
Specific Building Code:
2012 SBC
Is this a substantial alteration?:
No
Action Type:
New
Number of Proposed Building Stories:
2
Number of Proposed Below-Grade Building Stories:
0
Number of Mezzanines:
0
Will you change the building use or occupancy?:
No
Is a certificate of occupancy required?:
Yes
GROUND DISTURBANCE
Land Disturbing Activity:
Yes
Are you doing more than 2,000 square feet of earth disturbance?:
Yes
I, the owner or owner’s authorized representative of the property referenced in this submission, give the City of Seattle Department of Planning and Development permission to conduct a Pre-Application Site Visit. I agree that: 1) electronic filing constitutes an authorizing signature; 2) I will inform all tenants of the site visit prior to the inspection being conducted; and 3) if conditions such as uncontrolled dogs or uncooperative tenants hinder the inspector’s ability to conduct the site visit, the site visit will not occur and the site visit fee may be forfeited.:
Yes
LAND USE STREET ELEMENTS
Number of Curb Cuts for This Permit:
0
Tenant Relocation Assistance
Residential Unit Occupancy:
Unit(s) on Property Not Affected by Scope
WASTE DIVERSION
Waste Diversion Plan Required:
Yes
EMERGENCY SYSTEMS
Are Emergency Systems Required for this Project?:
No
MECHANICAL CODE
Does your project include an HVAC mechanical system?:
Yes
ENERGY CODE
Compliance Category:
Commercial
Compliance Path:
Prescriptive
ENERGY EQUIPMENT
AFUE Efficiency (percentage):
0
HSPF Efficiency (percentage):
0
Heating Fuel Type Proposed: Non-Residential:
Electric Heat Pump
Cooling Fuel Type Proposed: Non-Residential:
Electric Heat Pump
Special Requirements:
PV System on Building 900 1.2 KW 175 square feet. Plus a solar ready roof on building 500 of 7,200 square feet.
SIDE SEWER INFORMATION
Pipe Lining in the Right-of-Way:
No
Curb Crossing and/or Staging:
No
Excavation:
No
Roadway Restoration:
No
DRAINAGE INFORMATION
Number of Service Drain Lines Capped:
0
Drainage Type of Work:
New
Number of New Drainage Connections to the Main:
1
Number of Other New Drainage Connections:
0
Number of Drainage New/Replaced/Repair Pumps:
0
Flow Control Type:
No Control
Treatment Standard Type:
No Treatment
Discharge Point:
Storm System
Total Disturbed Area:
135558
New Impervious Surface:
0
New Plus Replaced Impervious Surface:
97890
Total Volume Managed by On-Site Stormwater Management (gallons):
717129
Total Area Requiring Soil Amendment:
37668
SANITARY INFORMATION
Number of Service Sewer Lines Capped:
0
Sanitary Type of Work:
New
Number of New Sewer Connections to the Main:
1
Number of New Connections to the Side Sewer:
0
Number of Sewer New/Replaced/Repair Pumps:
0
Reuse Existing Side Sewer System:
No