HISTORICAL
Hansen APNO:
6550116
Hansen APKEY:
671753
PERMIT APPLICATION COMMON
Is work in the right-of-way (street or alley) required?:
Yes
Choose the Primary Property Use:
Commercial
Project Value:
243009152
CONSTRUCTION VALUATION INFO
Intake Value: New:
278885229
Intake Value: Alteration:
0
Total Intake Value:
278885229
Issue Value: New:
223537945
Issue Value: Alteration:
0
Total Issued Value:
223537945
BUILDING CODE INFO
What building code was used for your design?:
2015 SBC
Is this a substantial alteration?:
No
Action Type:
New
Number of Proposed Building Stories:
13
Number of Proposed Below-Grade Building Stories:
2
Number of Mezzanines:
6
Is this a high-rise?:
Yes
Will you change the building use or occupancy?:
No
Is a certificate of occupancy required?:
Yes
GROUND DISTURBANCE
Land Disturbing Activity:
Yes
Is the ground disturbance in an environmentally critical area?:
Yes
What is the amount of ground disturbance?:
Yes
I, the owner or owner’s authorized representative of the property referenced in this submission, give the City of Seattle Department of Planning and Development permission to conduct a Pre-Application Site Visit. I agree that: 1) electronic filing constitutes an authorizing signature; 2) I will inform all tenants of the site visit prior to the inspection being conducted; and 3) if conditions such as uncontrolled dogs or uncooperative tenants hinder the inspector’s ability to conduct the site visit, the site visit will not occur and the site visit fee may be forfeited.:
Yes
PERMIT TRACKING COMMON
Review Level:
Full C
Application Completed Date:
05/26/2017
Permit Issued Date:
10/12/2018
Permit Remarks:
Permit has been approved for 3-year permit expiration.
LAND USE STREET ELEMENTS
Number of Curb Cuts for This Permit:
0
Tenant Relocation Assistance
Residential Unit Occupancy:
Unit(s) on Property Not Affected by Scope
WASTE DIVERSION
Waste Diversion Plan Required:
No
FIRE PROTECTION SYSTEMS
Sprinklers Meet NFPA 13:
Yes
EMERGENCY SYSTEMS
Are Emergency Systems Required for this Project?:
Yes
Elevator Pressurization:
Yes
Exit and Pathway Lighting:
Yes
Stairway Pressurization:
Yes
Smoke Removal System:
Yes
Emergency Generator:
Yes
Accessible Elevator Egress:
Yes
MECHANICAL CODE
Does your project include an HVAC mechanical system?:
Yes
ENERGY CODE
Compliance Category:
Commercial
Compliance Path:
Total Building Performance (TBP)
ENERGY EQUIPMENT
Heating Fuel Type Proposed: Non-Residential:
Other
Special Requirements:
SEC C411 by TBP
SIDE SEWER INFORMATION
Temporary Dewatering for Construction:
Yes
Pipe Lining on Private Property:
No
Pipe Lining in the Right-of-Way:
No
Side Sewer Conflict:
No
Side Sewer Conflict Description:
No
Is the system required by the Department of Ecology?:
No
Curb Crossing and/or Staging:
Yes
Excavation:
Yes
Roadway Restoration:
Yes
DRAINAGE INFORMATION
Number of Service Drain Lines Capped:
0
Drainage Type of Work:
New
Number of New Drainage Connections to the Main:
3
Flow Control Type:
Vault
Flow Control Standard:
Peak
Treatment Standard Type:
No Treatment
Discharge Point:
Combined System
Total Disturbed Area:
282786
New Impervious Surface:
0
New Plus Replaced Impervious Surface:
277795
Total Volume Managed by On-Site Stormwater Management (gallons):
100733
Total Area Requiring Soil Amendment:
4991
SANITARY INFORMATION
Number of Service Sewer Lines Capped:
14
Sanitary Type of Work:
New
Number of New Sewer Connections to the Main:
3
Number of New Dwelling Units:
0
Reuse Existing Side Sewer System:
No