HISTORICAL
Hansen APNO:
6518801
Hansen APKEY:
637723
PERMIT APPLICATION COMMON
Where on your property are you working?:
8/24/2016 SLB CHANGED ADDRESS FROM 2617 NE UNIVERSITY VILLAGE PL NE TO 2651 NE 49TH ST
Is work in the right-of-way (street or alley) required?:
No
Choose the Primary Property Use:
Commercial
Project Value:
5200000
CONSTRUCTION VALUATION INFO
Intake Value: New:
5200000
Total Intake Value:
5200000
Issue Value: New:
5200000
Total Issued Value:
5200000
BUILDING CODE INFO
What building code was used for your design?:
2012 SBC
Specific Building Code:
2012 SBC
Is this a substantial alteration?:
No
Action Type:
New
Number of Proposed Building Stories:
1
Number of Proposed Below-Grade Building Stories:
1
Number of Mezzanines:
0
Is this a high-rise?:
No
Will you change the building use or occupancy?:
Yes
Is a certificate of occupancy required?:
Yes
GROUND DISTURBANCE
Land Disturbing Activity:
Yes
Is the ground disturbance in an environmentally critical area?:
No
What is the amount of ground disturbance?:
Yes
PERMIT TRACKING COMMON
Review Level:
Full C
Application Completed Date:
08/24/2016
Permit Issued Date:
01/03/2017
Inspections Completed Date:
06/26/2018
Certificate of Occupancy Issued Date:
06/26/2018
LAND USE STREET ELEMENTS
Number of Curb Cuts for This Permit:
0
Tenant Relocation Assistance
Residential Unit Occupancy:
Unit(s) on Property Not Affected by Scope
WASTE DIVERSION
Waste Diversion Plan Required:
No
EMERGENCY SYSTEMS
Elevator Pressurization:
No
Stairway Pressurization:
No
Accessible Elevator Egress:
No
MECHANICAL CODE
Does your project include an HVAC mechanical system?:
No
ENERGY CODE
Compliance Category:
Commercial
Compliance Path:
Annual Energy Analysis
ENERGY EQUIPMENT
AFUE Efficiency (percentage):
0
HSPF Efficiency (percentage):
0
Heating Fuel Type Proposed: Non-Residential:
Electric Heat Pump
Cooling Fuel Type Proposed: Non-Residential:
Electric Heat Pump
SIDE SEWER INFORMATION
Pipe Lining in the Right-of-Way:
No
Curb Crossing and/or Staging:
No
Excavation:
No
Roadway Restoration:
No
DRAINAGE INFORMATION
Number of Service Drain Lines Capped:
0
Drainage Type of Work:
New
Number of New Drainage Connections to the Main:
1
Number of Other New Drainage Connections:
0
Number of Drainage New/Replaced/Repair Pumps:
0
Flow Control Type:
No Control
Treatment Standard Type:
No Treatment
Discharge Point:
Storm System
Total Disturbed Area:
35125
New Impervious Surface:
0
New Plus Replaced Impervious Surface:
21444
Total Volume Managed by On-Site Stormwater Management (gallons):
101884
Total Area Requiring Soil Amendment:
3655
SANITARY INFORMATION
Number of Service Sewer Lines Capped:
0
Sanitary Type of Work:
New
Number of New Sewer Connections to the Main:
1
Number of New Connections to the Side Sewer:
0
Number of Sewer New/Replaced/Repair Pumps:
0
Reuse Existing Side Sewer System:
No