PERMIT APPLICATION COMMON
Where on your property are you working?:
AVA AT CAPITAL HILL
Choose the Primary Property Use:
Commercial
Project Value:
1493639
PERMIT TRACKING COMMON
Review Level:
Full C
Application Completed Date:
06/04/2015
Permit Issued Date:
02/24/2016
Inspections Completed Date:
10/01/2019
Certificate of Occupancy Issued Date:
10/01/2019
Permit Remarks:
Do not issue until A/P 6336739 C of O issue.8/27/15 DG Mechanical Inspector; to meet the noise requirements for this project: Noise barrier for CT-1 and 2. The barriers must be constructed out of, a minimum,3/4" plywood, 3'-4' from the CTs, extend 18' above CTs, and 6" above roof deck. The barrier is on the N and W sides. MAU-1, must have a 3' duct silencer.
CONSTRUCTION VALUATION INFO
Intake Value: New:
1493639
Intake Value: Alteration:
0
Total Intake Value:
1493639
Issue Value: New:
1493639
Issue Value: Alteration:
0
Total Issued Value:
1493639
BUILDING CODE INFO
What building code was used for your design?:
2012 SEBC Prescriptive
Specific Building Code:
2012 SEBC Prescriptive
Action Type:
Add/Alt
Number of Existing Building Stories:
7
Number of Existing Below-Grade Building Stories:
3
Number of Proposed Building Stories:
7
Number of Proposed Below-Grade Building Stories:
3
Number of Mezzanines:
0
Is this a high-rise?:
No
Will you change the building use or occupancy?:
Yes
Is a certificate of occupancy required?:
Yes
GROUND DISTURBANCE
Land Disturbing Activity:
No
LAND USE STREET ELEMENTS
Number of Curb Cuts for This Permit:
0
Tenant Relocation Assistance
Residential Unit Occupancy:
Unit(s) on Property Not Affected by Scope
WASTE DIVERSION
Waste Diversion Plan Required:
Yes
FIRE PROTECTION SYSTEMS
Sprinklers Meet NFPA 13:
Yes
EMERGENCY SYSTEMS
Are Emergency Systems Required for this Project?:
No
MECHANICAL CODE
Does your project include an HVAC mechanical system?:
Yes
ENERGY CODE
Compliance Category:
Commercial
Compliance Path:
Prescriptive
ENERGY EQUIPMENT
AFUE Efficiency (percentage):
0
HSPF Efficiency (percentage):
0
Heating Fuel Type Proposed: Non-Residential:
Other
SANITARY INFORMATION
Reuse Existing Side Sewer System:
No
PERMIT APPLICATION COMMON
Is work in the right-of-way (street or alley) required?:
No