PERMIT APPLICATION COMMON
Choose the Primary Property Use:
Commercial
Project Value:
146164991
PERMIT TRACKING COMMON
Review Level:
Full C
Application Completed Date:
06/01/2015
Permit Remarks:
6/10/15 DG Mechanical Inspector: The noise report states; to meet the objective standard in the noise ordinance, mitigation is needed for the supply and exhaust fans SF-M03. This will require an acoustical louver and silencer. EF-M01 requires a silencer and 10 feet of 1 inch duct liner. Please validate this mitigation package is installed before final.
CONSTRUCTION VALUATION INFO
Intake Value: New:
146164991
Intake Value: Alteration:
0
Total Intake Value:
146164991
Issue Value: New:
0
Issue Value: Alteration:
0
Total Issued Value:
0
BUILDING CODE INFO
What building code was used for your design?:
2012 SBC
Specific Building Code:
2012 SBC
Action Type:
New
Will you change the building use or occupancy?:
Yes
Is a certificate of occupancy required?:
Yes
GROUND DISTURBANCE
Land Disturbing Activity:
Yes
Are you doing more than 2,000 square feet of earth disturbance?:
Yes
LAND USE STREET ELEMENTS
Number of Curb Cuts for This Permit:
0
Tenant Relocation Assistance
Residential Unit Occupancy:
Residential Units on Property Not Affected by Scope
WASTE DIVERSION
Waste Diversion Plan Required:
Yes
MECHANICAL CODE
Does your project include an HVAC mechanical system?:
Yes
ENERGY CODE
Compliance Category:
Commercial
Compliance Path:
Annual Energy Analysis
ENERGY EQUIPMENT
AFUE Efficiency (percentage):
0
HSPF Efficiency (percentage):
0
Heating Fuel Type Proposed: Residential:
Natural Gas
Cooling Fuel Type Proposed: Residential:
Electric Resistance
Heating Fuel Type Proposed: Non-Residential:
Natural Gas
Cooling Fuel Type Proposed: Non-Residential:
Electric Resistance
Special Requirements:
Applicant is utilizing C410.1 exception # 2 increased heat recovery. Total Building Performance Calculation.
SIDE SEWER INFORMATION
Pipe Lining in the Right-of-Way:
No
Curb Crossing and/or Staging:
No
Excavation:
No
Roadway Restoration:
No
DRAINAGE INFORMATION
Number of Service Drain Lines Capped:
0
Drainage Type of Work:
New
Number of New Drainage Connections to the Main:
1
Number of Other New Drainage Connections:
0
Number of Drainage New/Replaced/Repair Pumps:
1
Flow Control Type:
Vault
Flow Control Standard:
Peak
Treatment Standard Type:
No Treatment
Discharge Point:
Combined System
Total Disturbed Area:
57348
New Impervious Surface:
0
New Plus Replaced Impervious Surface:
57348
Total Volume Managed by On-Site Stormwater Management (gallons):
10950
Total Area Requiring Soil Amendment:
0
SANITARY INFORMATION
Number of Service Sewer Lines Capped:
4
Sanitary Type of Work:
New
Number of New Sewer Connections to the Main:
1
Number of New Connections to the Side Sewer:
0
Number of Sewer New/Replaced/Repair Pumps:
1
Reuse Existing Side Sewer System:
No