PERMIT APPLICATION COMMON
Choose the Primary Property Use:
Institutional
Project Value:
2234000
PERMIT TRACKING COMMON
Review Level:
Full C
Application Completed Date:
05/12/2015
Permit Issued Date:
12/23/2015
Inspections Completed Date:
10/16/2017
Certificate of Occupancy Issued Date:
10/16/2017
Permit Remarks:
Mechanical included this permit. Proof of liability insurance is not approved. Proof of insurance is postponed until prior to scheduling the preconstruction meeting. Contact the On-Call geotechnical engineer to determine status of insurance requirement. Install two 25 foot wide curb cuts along the south side of E Roanoke St. extending across the west and east property lines.
CONSTRUCTION VALUATION INFO
Intake Value: New:
2234000
Intake Value: Alteration:
0
Total Intake Value:
2234000
Issue Value: New:
2234000
Issue Value: Alteration:
0
Total Issued Value:
2234000
BUILDING CODE INFO
What building code was used for your design?:
2012 SBC
Specific Building Code:
2012 SBC
Action Type:
New
Number of Proposed Building Stories:
2
Number of Proposed Below-Grade Building Stories:
1
Number of Mezzanines:
0
Will you change the building use or occupancy?:
No
Is a certificate of occupancy required?:
Yes
GROUND DISTURBANCE
Land Disturbing Activity:
Yes
Are you doing more than 2,000 square feet of earth disturbance?:
Yes
I, the owner or owner’s authorized representative of the property referenced in this submission, give the City of Seattle Department of Planning and Development permission to conduct a Pre-Application Site Visit. I agree that: 1) electronic filing constitutes an authorizing signature; 2) I will inform all tenants of the site visit prior to the inspection being conducted; and 3) if conditions such as uncontrolled dogs or uncooperative tenants hinder the inspector’s ability to conduct the site visit, the site visit will not occur and the site visit fee may be forfeited.:
Yes
LAND USE STREET ELEMENTS
Number of Curb Cuts for This Permit:
2
Tenant Relocation Assistance
Residential Unit Occupancy:
Unit(s) on Property Not Affected by Scope
WASTE DIVERSION
Waste Diversion Plan Required:
Yes
FIRE PROTECTION SYSTEMS
Sprinklers Meet NFPA 13:
Yes
EMERGENCY SYSTEMS
Are Emergency Systems Required for this Project?:
No
MECHANICAL CODE
Does your project include an HVAC mechanical system?:
Yes
ENERGY CODE
Compliance Category:
Commercial
Compliance Path:
Annual Energy Analysis
ENERGY EQUIPMENT
AFUE Efficiency (percentage):
0
HSPF Efficiency (percentage):
0
Heating Fuel Type Proposed: Non-Residential:
Electric Heat Pump
Special Requirements:
SEC C410: PV
SIDE SEWER INFORMATION
Pipe Lining in the Right-of-Way:
No
Curb Crossing and/or Staging:
No
Excavation:
No
Roadway Restoration:
No
DRAINAGE INFORMATION
Number of Service Drain Lines Capped:
0
Drainage Type of Work:
New
Number of New Drainage Connections to the Main:
0
Number of Other New Drainage Connections:
1
Number of Drainage New/Replaced/Repair Pumps:
0
Flow Control Type:
Pipe
Flow Control Standard:
Peak
Treatment Standard Type:
No Treatment
Discharge Point:
Combined System
Total Disturbed Area:
14609
New Impervious Surface:
4443
New Plus Replaced Impervious Surface:
1403
Total Volume Managed by On-Site Stormwater Management (gallons):
4680
Total Area Requiring Soil Amendment:
1816
SANITARY INFORMATION
Number of Service Sewer Lines Capped:
0
Sanitary Type of Work:
New
Number of New Sewer Connections to the Main:
0
Number of New Connections to the Side Sewer:
1
Number of Sewer New/Replaced/Repair Pumps:
0
Reuse Existing Side Sewer System:
Yes