PERMIT APPLICATION COMMON
Is work in the right-of-way (street or alley) required?:
Yes
Choose the Primary Property Use:
Commercial
Project Value:
20000000
PERMIT TRACKING COMMON
Review Level:
Full C
Application Completed Date:
12/23/2013
Permit Issued Date:
03/12/2019
Inspections Completed Date:
01/14/2021
Certificate of Occupancy Issued Date:
01/14/2021
Permit Remarks:
This is a major MUP revision application. Recommendation meeting date tbdConstruct & Maintain (1) 26.5' curb cut off of Fairview AVe E.
CONSTRUCTION VALUATION INFO
Intake Value: New:
20000000
Intake Value: Alteration:
0
Total Intake Value:
20000000
Issue Value: New:
19330650
Issue Value: Alteration:
0
Total Issued Value:
19330650
BUILDING CODE INFO
What building code was used for your design?:
2009 SBC
Specific Building Code:
2009 SBC
Action Type:
New
Number of Proposed Building Stories:
4
Number of Proposed Below-Grade Building Stories:
1
Number of Mezzanines:
0
Is this a high-rise?:
No
Will you change the building use or occupancy?:
Yes
Is a certificate of occupancy required?:
No
GROUND DISTURBANCE
Land Disturbing Activity:
Yes
I, the owner or owner’s authorized representative of the property referenced in this submission, give the City of Seattle Department of Planning and Development permission to conduct a Pre-Application Site Visit. I agree that: 1) electronic filing constitutes an authorizing signature; 2) I will inform all tenants of the site visit prior to the inspection being conducted; and 3) if conditions such as uncontrolled dogs or uncooperative tenants hinder the inspector’s ability to conduct the site visit, the site visit will not occur and the site visit fee may be forfeited.:
Yes
LAND USE STREET ELEMENTS
Number of Curb Cuts for This Permit:
0
Tenant Relocation Assistance
Residential Unit Occupancy:
Unit(s) on Property Not Affected by Scope
WASTE DIVERSION
Waste Diversion Plan Required:
No
FIRE PROTECTION SYSTEMS
Sprinklers Meet NFPA 13:
Yes
EMERGENCY SYSTEMS
Are Emergency Systems Required for this Project?:
No
Elevator Pressurization:
No
Stairway Pressurization:
No
Accessible Elevator Egress:
No
MECHANICAL CODE
Does your project include an HVAC mechanical system?:
No
ENERGY CODE
Compliance Category:
Commercial
Compliance Path:
Component Performance
ENERGY EQUIPMENT
AFUE Efficiency (percentage):
0
HSPF Efficiency (percentage):
0
Heating Fuel Type Proposed: Non-Residential:
Unknown
Special Requirements:
Since cold shell & core only for this permit, future warm shell & core and initial T.I. will comply with 2009 SEC renewal energy as noted on drawing M0.01.
SIDE SEWER INFORMATION
Related New Construction Project:
6375854
Temporary Dewatering for Construction:
No
Pipe Lining in the Right-of-Way:
No
Curb Crossing and/or Staging:
Yes
Excavation:
Yes
Roadway Restoration:
Yes
DRAINAGE INFORMATION
Number of Service Drain Lines Capped:
0
Drainage Type of Work:
New
Number of New Drainage Connections to the Main:
1
Number of Other New Drainage Connections:
0
Number of Drainage New/Replaced/Repair Pumps:
0
Flow Control Type:
Vault
Flow Control Standard:
Peak
Treatment Standard Type:
No Treatment
Discharge Point:
Combined System
Total Disturbed Area:
32990
New Impervious Surface:
2500
New Plus Replaced Impervious Surface:
32990
Total Volume Managed by On-Site Stormwater Management (gallons):
4012
Total Area Requiring Soil Amendment:
0
SANITARY INFORMATION
Number of Service Sewer Lines Capped:
1
Sanitary Type of Work:
New
Number of New Sewer Connections to the Main:
2
Number of New Connections to the Side Sewer:
0
Number of Sewer New/Replaced/Repair Pumps:
0
Reuse Existing Side Sewer System:
No
SHORELINE MITIGATION SEQUENCE
Sequencing Required:
No
GROUND DISTURBANCE
Is the ground disturbance in an environmentally critical area?:
No
PARKING
Number of Existing Onsite Parking Spaces:
0
Number of Existing Offsite Parking Spaces:
0
Number of Existing Accessible Parking Spaces:
0
Number of Proposed Onsite Parking Spaces:
0
Number of Proposed Offsite Parking Spaces:
0
Offsite Parking Location:
0
Number of Proposed Accessible Parking Spaces:
0
Number of Existing Bicycle Parking Spots:
0
Number of Proposed Bicycle Parking Spots:
0