PERMIT APPLICATION COMMON
Choose the Primary Property Use:
Commercial
Project Value:
237079
PERMIT TRACKING COMMON
Review Level:
Full C
Application Completed Date:
05/04/2012
Permit Issued Date:
07/09/2012
Inspections Completed Date:
12/24/2012
Certificate of Occupancy Issued Date:
12/20/2012
Permit Remarks:
Priority Green Expedited To construct and maintain and maintain two commercial curbcuts 15'0 wide each to be roughly centered along the East Madison St.frontage with approx. 39'0" between the two curbcuts.
CONSTRUCTION VALUATION INFO
Intake Value: New:
237079
Intake Value: Alteration:
0
Total Intake Value:
237079
Issue Value: New:
237079
Issue Value: Alteration:
0
Total Issued Value:
237079
BUILDING CODE INFO
What building code was used for your design?:
2009 SBC
Specific Building Code:
2009 SBC
Action Type:
New
Number of Proposed Building Stories:
1
Number of Proposed Below-Grade Building Stories:
0
Number of Mezzanines:
0
Is this a high-rise?:
No
Will you change the building use or occupancy?:
Yes
Does your project qualify for our Priority Green Incentive program?:
Expedited
Is a certificate of occupancy required?:
Yes
GROUND DISTURBANCE
Land Disturbing Activity:
Yes
Are you doing more than 2,000 square feet of earth disturbance?:
Yes
LAND USE STREET ELEMENTS
Number of Curb Cuts for This Permit:
2
Tenant Relocation Assistance
Residential Unit Occupancy:
Unit(s) on Property Not Affected by Scope
WASTE DIVERSION
Waste Diversion Plan Required:
No
EMERGENCY SYSTEMS
Are Emergency Systems Required for this Project?:
No
MECHANICAL CODE
Does your project include an HVAC mechanical system?:
No
ENERGY CODE
Compliance Category:
Commercial
Compliance Path:
Component Performance
ENERGY EQUIPMENT
AFUE Efficiency (percentage):
0
HSPF Efficiency (percentage):
0
SIDE SEWER INFORMATION
Pipe Lining in the Right-of-Way:
No
Curb Crossing and/or Staging:
No
Excavation:
No
Roadway Restoration:
No
DRAINAGE INFORMATION
Number of Service Drain Lines Capped:
0
Drainage Type of Work:
New
Number of New Drainage Connections to the Main:
0
Number of Other New Drainage Connections:
1
Number of Drainage New/Replaced/Repair Pumps:
0
Flow Control Type:
No Control
Flow Control Standard:
Peak
Treatment Standard Type:
Basic
Discharge Point:
Combined System
Total Disturbed Area:
3000
New Impervious Surface:
2500
New Plus Replaced Impervious Surface:
2500
Total Volume Managed by On-Site Stormwater Management (gallons):
2500
Total Area Requiring Soil Amendment:
5000
SANITARY INFORMATION
Number of Service Sewer Lines Capped:
0
Sanitary Type of Work:
New
Number of New Sewer Connections to the Main:
0
Number of New Connections to the Side Sewer:
1
Number of Sewer New/Replaced/Repair Pumps:
0
Reuse Existing Side Sewer System:
Yes