PERMIT APPLICATION COMMON
Choose the Primary Property Use:
Commercial
Project Value:
3000000
PERMIT TRACKING COMMON
Review Level:
Full C
Application Completed Date:
10/28/2011
Permit Issued Date:
11/16/2012
Inspections Completed Date:
09/24/2015
Permit Remarks:
No preconstruction meeting may be held until the contractor's commercial liability insurance is approved by City Risk Management. City Risk Management will clear in Hansen under "Ins Defer" tab.
CONSTRUCTION VALUATION INFO
Intake Value: New:
3000000
Intake Value: Alteration:
0
Total Intake Value:
3000000
Issue Value: New:
0
Issue Value: Alteration:
0
Total Issued Value:
3000000
BUILDING CODE INFO
What building code was used for your design?:
2009 SBC
Specific Building Code:
2009 SBC
Is this a substantial alteration?:
No
Action Type:
New
Number of Proposed Building Stories:
0
Number of Proposed Below-Grade Building Stories:
0
Number of Mezzanines:
0
Will you change the building use or occupancy?:
No
Does your project qualify for our Priority Green Incentive program?:
No
Is a certificate of occupancy required?:
No
GROUND DISTURBANCE
Land Disturbing Activity:
Yes
Are you doing more than 2,000 square feet of earth disturbance?:
Yes
LAND USE STREET ELEMENTS
Number of Curb Cuts for This Permit:
0
Tenant Relocation Assistance
Residential Unit Occupancy:
Unit(s) on Property Not Affected by Scope
WASTE DIVERSION
Waste Diversion Plan Required:
No
EMERGENCY SYSTEMS
Are Emergency Systems Required for this Project?:
No
MECHANICAL CODE
Does your project include an HVAC mechanical system?:
No
SIDE SEWER INFORMATION
Pipe Lining in the Right-of-Way:
No
Curb Crossing and/or Staging:
No
Excavation:
No
Roadway Restoration:
No
DRAINAGE INFORMATION
Number of Service Drain Lines Capped:
0
Drainage Type of Work:
New
Number of New Drainage Connections to the Main:
1
Number of Other New Drainage Connections:
0
Number of Drainage New/Replaced/Repair Pumps:
0
Flow Control Type:
No Control
Treatment Standard Type:
No Treatment
Discharge Point:
Storm System
Total Disturbed Area:
99
New Impervious Surface:
99
New Plus Replaced Impervious Surface:
99
Total Volume Managed by On-Site Stormwater Management (gallons):
99
Total Area Requiring Soil Amendment:
99
SANITARY INFORMATION
Number of Service Sewer Lines Capped:
0
Sanitary Type of Work:
New
Number of New Sewer Connections to the Main:
1
Number of New Connections to the Side Sewer:
0
Number of Sewer New/Replaced/Repair Pumps:
0
Reuse Existing Side Sewer System:
No