PERMIT APPLICATION COMMON
Choose the Primary Property Use:
Commercial
Project Value:
300000
PERMIT TRACKING COMMON
Review Level:
Full C
Application Completed Date:
05/13/2011
Permit Issued Date:
06/30/2011
Inspections Completed Date:
05/14/2012
Permit Remarks:
Mup must be issued first. Excavation insurance requirement must be satisfied prior to scheduling the preconstruction meeting. Please contact the on-call geotechnical engineer to determine the status of the insurance requirement. Note that SPU has construction method and monitoring. MUP 3011812 Issued 6/21/2011
CONSTRUCTION VALUATION INFO
Intake Value: New:
300000
Intake Value: Alteration:
0
Total Intake Value:
300000
Issue Value: New:
0
Issue Value: Alteration:
300000
Total Issued Value:
300000
BUILDING CODE INFO
What building code was used for your design?:
2009 SBC
Specific Building Code:
2009 SBC
Is this a substantial alteration?:
No
Action Type:
New
Number of Proposed Building Stories:
0
Number of Proposed Below-Grade Building Stories:
0
Number of Mezzanines:
0
Is this a high-rise?:
No
Will you change the building use or occupancy?:
Yes
Does your project qualify for our Priority Green Incentive program?:
No
Is a certificate of occupancy required?:
No
GROUND DISTURBANCE
Land Disturbing Activity:
Yes
Are you doing more than 2,000 square feet of earth disturbance?:
Yes
I, the owner or owner’s authorized representative of the property referenced in this submission, give the City of Seattle Department of Planning and Development permission to conduct a Pre-Application Site Visit. I agree that: 1) electronic filing constitutes an authorizing signature; 2) I will inform all tenants of the site visit prior to the inspection being conducted; and 3) if conditions such as uncontrolled dogs or uncooperative tenants hinder the inspector’s ability to conduct the site visit, the site visit will not occur and the site visit fee may be forfeited.:
Yes
LAND USE STREET ELEMENTS
Number of Curb Cuts for This Permit:
0
Tenant Relocation Assistance
Residential Unit Occupancy:
Unit(s) on Property Not Affected by Scope
WASTE DIVERSION
Waste Diversion Plan Required:
No
EMERGENCY SYSTEMS
Are Emergency Systems Required for this Project?:
No
MECHANICAL CODE
Does your project include an HVAC mechanical system?:
No
SANITARY INFORMATION
Reuse Existing Side Sewer System:
No