PERMIT APPLICATION COMMON
Where on your property are you working?:
CHANGED ADDRESS FROM 4000 15TH AVE NE TO 3800 MONTLAKE BLVD NE
Choose the Primary Property Use:
Institutional
Project Value:
160000000
PERMIT TRACKING COMMON
Review Level:
Full C
Application Completed Date:
07/11/2011
Permit Issued Date:
08/16/2012
Inspections Completed Date:
11/19/2013
Certificate of Occupancy Issued Date:
11/18/2013
Permit Remarks:
6273320 (Selective Demolition) and 6300573 (Shoring and Excavation) separated from 6278200 11-2-2011 6301851 foundation and complete structural 11-15-11
CONSTRUCTION VALUATION INFO
Intake Value: New:
0
Intake Value: Alteration:
160000000
Total Intake Value:
160000000
Issue Value: New:
0
Issue Value: Alteration:
112500000
Total Issued Value:
112500000
BUILDING CODE INFO
What building code was used for your design?:
2009 SBC
Specific Building Code:
2009 SBC
Action Type:
Add/Alt
Number of Existing Building Stories:
7
Number of Existing Below-Grade Building Stories:
1
Number of Proposed Building Stories:
7
Number of Proposed Below-Grade Building Stories:
1
Number of Mezzanines:
0
Is this a high-rise?:
No
Will you change the building use or occupancy?:
No
Is a certificate of occupancy required?:
Yes
GROUND DISTURBANCE
Land Disturbing Activity:
Yes
Are you doing more than 2,000 square feet of earth disturbance?:
Yes
I, the owner or owner’s authorized representative of the property referenced in this submission, give the City of Seattle Department of Planning and Development permission to conduct a Pre-Application Site Visit. I agree that: 1) electronic filing constitutes an authorizing signature; 2) I will inform all tenants of the site visit prior to the inspection being conducted; and 3) if conditions such as uncontrolled dogs or uncooperative tenants hinder the inspector’s ability to conduct the site visit, the site visit will not occur and the site visit fee may be forfeited.:
Yes
LAND USE STREET ELEMENTS
Number of Curb Cuts for This Permit:
0
Tenant Relocation Assistance
Residential Unit Occupancy:
Unit(s) on Property Not Affected by Scope
WASTE DIVERSION
Waste Diversion Plan Required:
No
FIRE PROTECTION SYSTEMS
Sprinklers Meet NFPA 13:
Yes
EMERGENCY SYSTEMS
Are Emergency Systems Required for this Project?:
Yes
Elevator Pressurization:
Yes
Stairway Pressurization:
No
Accessible Elevator Egress:
Yes
MECHANICAL CODE
Does your project include an HVAC mechanical system?:
Yes
ENERGY CODE
Compliance Category:
Commercial
Compliance Path:
Annual Energy Analysis
SIDE SEWER INFORMATION
Pipe Lining in the Right-of-Way:
No
Curb Crossing and/or Staging:
No
Excavation:
No
Roadway Restoration:
No
DRAINAGE INFORMATION
Number of Service Drain Lines Capped:
0
Drainage Type of Work:
New
Number of New Drainage Connections to the Main:
0
Number of Other New Drainage Connections:
1
Number of Drainage New/Replaced/Repair Pumps:
0
Flow Control Type:
No Control
Flow Control Standard:
Peak
Treatment Standard Type:
Basic Plus
Basic Plus Type:
Oil
Discharge Point:
Direct
Total Disturbed Area:
500000
New Impervious Surface:
400000
New Plus Replaced Impervious Surface:
400000
Total Volume Managed by On-Site Stormwater Management (gallons):
0
Total Area Requiring Soil Amendment:
500000
SANITARY INFORMATION
Number of Service Sewer Lines Capped:
0
Sanitary Type of Work:
New
Number of New Sewer Connections to the Main:
0
Number of New Connections to the Side Sewer:
1
Number of Sewer New/Replaced/Repair Pumps:
0
Reuse Existing Side Sewer System:
Yes