PERMIT APPLICATION COMMON
Choose the Primary Property Use:
Commercial
PERMIT TRACKING COMMON
Review Level:
Full +
Application Completed Date:
12/15/2015
Permit Issued Date:
07/27/2016
Permit Remarks:
Prior to structural demolition of the eastern half of the block (see note on sheet S201), a performance bond, or another vehicle as approved by the SDCI Director, must be secured as required by SDCI for the preservation and/or repair of the historic facades should they be damaged.
Tenant Relocation Assistance
Residential Unit Occupancy:
Unit(s) on Property Not Affected by Scope
GROUND DISTURBANCE
Land Disturbing Activity:
Yes
What is the amount of ground disturbance?:
Yes
I, the owner or owner’s authorized representative of the property referenced in this submission, give the City of Seattle Department of Planning and Development permission to conduct a Pre-Application Site Visit. I agree that: 1) electronic filing constitutes an authorizing signature; 2) I will inform all tenants of the site visit prior to the inspection being conducted; and 3) if conditions such as uncontrolled dogs or uncooperative tenants hinder the inspector’s ability to conduct the site visit, the site visit will not occur and the site visit fee may be forfeited.:
Yes
DEMOLITION INFO
Type of Demolition:
Demolition