PERMIT APPLICATION COMMON
Where on your property are you working?:
EAST TRIPLEX
Choose the Primary Property Use:
Multifamily
Project Value:
468693
PERMIT TRACKING COMMON
Review Level:
Dependent Building
Application Completed Date:
04/23/2010
Permit Issued Date:
05/30/2014
Inspections Completed Date:
08/31/2018
Permit Remarks:
one foot alley dedication under LBA 3011210.Permit issued ot dedicate alley. No inspection until dedication.
CONSTRUCTION VALUATION INFO
Intake Value: New:
468693
Intake Value: Alteration:
0
Total Intake Value:
468693
Issue Value: New:
468693
Issue Value: Alteration:
0
Total Issued Value:
468693
BUILDING CODE INFO
What building code was used for your design?:
2012 SRC
Specific Building Code:
2012 SRC
Action Type:
New
Number of Proposed Building Stories:
3
Number of Proposed Below-Grade Building Stories:
0
Number of Mezzanines:
0
Is this a high-rise?:
No
Will you change the building use or occupancy?:
Yes
Is a certificate of occupancy required?:
No
GROUND DISTURBANCE
Land Disturbing Activity:
Yes
Are you doing more than 2,000 square feet of earth disturbance?:
No
I, the owner or owner’s authorized representative of the property referenced in this submission, give the City of Seattle Department of Planning and Development permission to conduct a Pre-Application Site Visit. I agree that: 1) electronic filing constitutes an authorizing signature; 2) I will inform all tenants of the site visit prior to the inspection being conducted; and 3) if conditions such as uncontrolled dogs or uncooperative tenants hinder the inspector’s ability to conduct the site visit, the site visit will not occur and the site visit fee may be forfeited.:
Yes
LAND USE STREET ELEMENTS
Number of Curb Cuts for This Permit:
0
Tenant Relocation Assistance
Residential Unit Occupancy:
Unit(s) on Property Not Affected by Scope
WASTE DIVERSION
Waste Diversion Plan Required:
No
EMERGENCY SYSTEMS
Are Emergency Systems Required for this Project?:
No
MECHANICAL CODE
Does your project include an HVAC mechanical system?:
No
ENERGY EQUIPMENT
AFUE Efficiency (percentage):
0
HSPF Efficiency (percentage):
0
SIDE SEWER INFORMATION
Related New Construction Project:
6244005
Pipe Lining in the Right-of-Way:
No
Curb Crossing and/or Staging:
No
Excavation:
No
Roadway Restoration:
No
DRAINAGE INFORMATION
Number of Service Drain Lines Capped:
0
Drainage Type of Work:
New
Number of New Drainage Connections to the Main:
0
Number of Other New Drainage Connections:
1
Number of Drainage New/Replaced/Repair Pumps:
0
Flow Control Type:
No Control
Treatment Standard Type:
No Treatment
Discharge Point:
Combined System
Total Disturbed Area:
5635
New Impervious Surface:
4200
New Plus Replaced Impervious Surface:
4280
Total Volume Managed by On-Site Stormwater Management (gallons):
4300
Total Area Requiring Soil Amendment:
1508
SANITARY INFORMATION
Number of Service Sewer Lines Capped:
0
Sanitary Type of Work:
New
Number of New Sewer Connections to the Main:
0
Number of New Connections to the Side Sewer:
1
Number of Sewer New/Replaced/Repair Pumps:
0
Reuse Existing Side Sewer System:
Yes