PERMIT APPLICATION COMMON
Choose the Primary Property Use:
Industrial
Project Value:
3207989
PERMIT TRACKING COMMON
Review Level:
Full C
Application Completed Date:
03/23/2010
Permit Issued Date:
08/09/2012
Inspections Completed Date:
05/01/2014
Certificate of Occupancy Issued Date:
04/29/2014
CONSTRUCTION VALUATION INFO
Intake Value: New:
0
Intake Value: Alteration:
3207989
Total Intake Value:
3207989
Issue Value: New:
0
Issue Value: Alteration:
3207989
Total Issued Value:
3207989
BUILDING CODE INFO
What building code was used for your design?:
2006 SBC
Specific Building Code:
2006 SBC
Is this a substantial alteration?:
Yes
Action Type:
Add/Alt
Number of Existing Building Stories:
3
Number of Existing Below-Grade Building Stories:
0
Number of Proposed Building Stories:
3
Number of Proposed Below-Grade Building Stories:
0
Number of Mezzanines:
0
Is this a high-rise?:
No
Will you change the building use or occupancy?:
No
Is a certificate of occupancy required?:
No
GROUND DISTURBANCE
Land Disturbing Activity:
Yes
Are you doing more than 2,000 square feet of earth disturbance?:
Yes
LAND USE STREET ELEMENTS
Number of Curb Cuts for This Permit:
0
Tenant Relocation Assistance
Residential Unit Occupancy:
Residential Units on Property Not Affected by Scope
WASTE DIVERSION
Waste Diversion Plan Required:
No
FIRE PROTECTION SYSTEMS
Sprinklers Meet NFPA 13:
Yes
EMERGENCY SYSTEMS
Are Emergency Systems Required for this Project?:
No
MECHANICAL CODE
Does your project include an HVAC mechanical system?:
No
SIDE SEWER INFORMATION
Pipe Lining in the Right-of-Way:
No
Curb Crossing and/or Staging:
No
Excavation:
No
Roadway Restoration:
No
DRAINAGE INFORMATION
Number of Service Drain Lines Capped:
0
Drainage Type of Work:
Addition/Alteration
Number of New Drainage Connections to the Main:
0
Number of Other New Drainage Connections:
0
Number of Drainage New/Replaced/Repair Pumps:
0
Flow Control Type:
Pipe
Flow Control Standard:
Peak
Treatment Standard Type:
Basic Plus
Basic Plus Type:
Oil
Discharge Point:
Combined System
Total Disturbed Area:
99
New Impervious Surface:
99
New Plus Replaced Impervious Surface:
99
Total Volume Managed by On-Site Stormwater Management (gallons):
99
Total Area Requiring Soil Amendment:
99
SANITARY INFORMATION
Number of Service Sewer Lines Capped:
0
Sanitary Type of Work:
Addition/Alteration
Number of New Sewer Connections to the Main:
0
Number of New Connections to the Side Sewer:
0
Number of Sewer New/Replaced/Repair Pumps:
0
Reuse Existing Side Sewer System:
Yes