PERMIT APPLICATION COMMON
Where on your property are you working?:
4/20/09 SAC ADDRESS CHNDG FRM 1520 UTAH AVE S TO 1501 1ST AVE S
Choose the Primary Property Use:
Commercial
Project Value:
29111320
PERMIT TRACKING COMMON
Review Level:
Full C
Application Completed Date:
01/08/2010
Permit Issued Date:
05/25/2010
Inspections Completed Date:
06/15/2012
Certificate of Occupancy Issued Date:
06/14/2012
Permit Remarks:
4/20/09 SAC ADDRESS CHNDG FRM 1520 UTAH AVE S TO 1501 1ST AVE S check on MUP design review conditions.
CONSTRUCTION VALUATION INFO
Intake Value: New:
29111320
Intake Value: Alteration:
0
Total Intake Value:
29111320
Issue Value: New:
29111320
Issue Value: Alteration:
0
Total Issued Value:
29111320
BUILDING CODE INFO
What building code was used for your design?:
2006 SBC
Specific Building Code:
2006 SBC
Is this a substantial alteration?:
No
Action Type:
New
Number of Proposed Building Stories:
6
Number of Proposed Below-Grade Building Stories:
1
Number of Mezzanines:
1
Will you change the building use or occupancy?:
Yes
Is a certificate of occupancy required?:
Yes
GROUND DISTURBANCE
Land Disturbing Activity:
Yes
I, the owner or owner’s authorized representative of the property referenced in this submission, give the City of Seattle Department of Planning and Development permission to conduct a Pre-Application Site Visit. I agree that: 1) electronic filing constitutes an authorizing signature; 2) I will inform all tenants of the site visit prior to the inspection being conducted; and 3) if conditions such as uncontrolled dogs or uncooperative tenants hinder the inspector’s ability to conduct the site visit, the site visit will not occur and the site visit fee may be forfeited.:
Yes
LAND USE STREET ELEMENTS
Number of Curb Cuts for This Permit:
3
Tenant Relocation Assistance
Residential Unit Occupancy:
Unit(s) on Property Not Affected by Scope
WASTE DIVERSION
Waste Diversion Plan Required:
No
FIRE PROTECTION SYSTEMS
Sprinklers Meet NFPA 13:
Yes
EMERGENCY SYSTEMS
Are Emergency Systems Required for this Project?:
Yes
Elevator Pressurization:
No
Stairway Pressurization:
No
Accessible Elevator Egress:
Yes
MECHANICAL CODE
Does your project include an HVAC mechanical system?:
No
ENERGY CODE
Compliance Category:
Commercial
Compliance Path:
Component Performance
ENERGY EQUIPMENT
AFUE Efficiency (percentage):
0
HSPF Efficiency (percentage):
0
SANITARY INFORMATION
Reuse Existing Side Sewer System:
No