LAND USE CONDITIONS |
Condition Category: During Construction Condition Details: 10.If floating debris enters the water during the proposed work this debris shall be removed immediately and stored until it can be disposed of at an appropriate upland facility. Building ID: NONE Verification Group: LU Planner Verification Date: 08/19/2008 Verified By: ANDERSDD |
Condition Category: During Construction Condition Details: 11.If heavy (sinking) debris enters the water during the proposed work the location of the debris shall be documented. When construction is complete a diver shall retrieve all debris that has entered the water and sunk during the proposed work. Building ID: NONE Verification Group: LU Planner Verification Date: 08/19/2008 Verified By: ANDERSDD |
Condition Category: During Construction Condition Details: 12.Equipment using oil, gasoline, or diesel used on site shall be checked for evidence of leakage, if evidence of leakage is found the further use of such equipment shall be suspended until the deficiency has been satisfactorily corrected. Building ID: NONE Verification Group: LU Planner Verification Date: 08/19/2008 Verified By: ANDERSDD |
Condition Category: During Construction Condition Details: 13.If treated wood is proposed for other structures, this wood shall be professionally treated and completely cured using the best management practices developed by the Western Wood Preservers Institute (http://www.wwpinstitute.org/) before this wood is used for this project. Building ID: NONE Verification Group: LU Planner Verification Date: 08/19/2008 Verified By: ANDERSDD |
Condition Category: During Construction Condition Details: 14.Existing timber piles proposed to be removed shall be full extracted by direct pulling with a barge or vibratory hammer. Hydraulic water jetting shall not be permitted. Remaining pile shall be filled with clean sand. If an existing pile cannot be extracted, the pile shall be cut off two (2) feet below the mudline and capped with clean sand or covered with a plastic or steel cap to insure that chemicals from the existing pile do not leach in to the adjacent sediments. Building ID: NONE Verification Group: LU Planner Verification Date: 08/19/2008 Verified By: ANDERSDD |
Condition Category: During Construction Condition Details: 15.During pile removal, skirting or containment booms shall be used to isolate piles if visible turbidity or sheen from suspected wood treatment residue is noted. Absorbent pads shall be used to control areas of visible sheen. Building ID: NONE Verification Group: LU Planner Verification Date: 08/19/2008 Verified By: ANDERSDD |
Condition Category: During Construction Condition Details: 16.All creosote material, pile stubs, and associated sediments must be disposed of in a landfill which meets the liner and leachate standards of the Minimum Functional Standards, Chapter 173-304 WAC. Building ID: NONE Verification Group: LU Planner Verification Date: 08/19/2008 Verified By: ANDERSDD |
Condition Category: During Construction Condition Details: 17.Catchbasins shall be protected during demolition, construction and repaving to prevent any deleterious material from entering the water. Building ID: NONE Verification Group: LU Planner Verification Date: 08/19/2008 Verified By: ANDERSDD |
Condition Category: During Construction Condition Details: 18.Provide video or photo documentation for removal of debris (rope, cable, tires, bottles, cans and other miscellaneous foreign debris) from the substrate as part of the Clean-up Documentation Plan. Building ID: NONE Verification Group: LU Planner Verification Date: 08/19/2008 Verified By: ANDERSDD |
Condition Category: During Construction Condition Details: 6.Prior to commencing construction, an emergency containment plan and procedures shall be developed for all toxic material that will be kept on site. All necessary equipment for containment and clean-up of this toxic material should be stocked on the site. A sufficient number of personnel, both during construction and during on-going operations, shall be trained in the proper implementation of this plan. Building ID: NONE Verification Group: LU Planner Verification Date: 08/19/2008 Verified By: ANDERSDD |
Condition Category: During Construction Condition Details: 7.Equipment for the transportation, storage, handling and application of oil, chemicals, or other hazardous materials shall be maintained in a safe and leak-proof condition to prevent release of this material into the water. If there is any evidence of leakage, the further use of such equipment shall be suspended until the deficiency has been satisfactorily corrected. Building ID: NONE Verification Group: LU Planner Verification Date: 08/19/2008 Verified By: ANDERSDD |
Condition Category: During Construction Condition Details: 8.A Section 10 Permit from the Army Corps of Engineers and a Hydraulic Project Approval Permit from Washington Department of Fish and Wildlife shall be successfully obtained and the terms and conditions of each permit shall be followed. Building ID: NONE Verification Group: LU Planner Verification Date: 08/19/2008 Verified By: ANDERSDD |
Condition Category: During Construction Condition Details: 9.The owner(s), builder(s), or responsible party(s) shall follow the BMPs developed for the project to prevent debris and other deleterious material from entering the water during demolition and construction. Building ID: NONE Verification Group: LU Planner Verification Date: 08/19/2008 Verified By: ANDERSDD |
Condition Category: Prior to Construction Permit Issuance Condition Details: 1.Develop and submit a Clean-up Documentation Plan that describes how the debris on the site will be cleaned up. Provide video or photo documentation for removal of debris (rope, cable, tires, bottles, cans and other miscellaneous foreign debris) from the substrate as part of the Clean-up Documentation Plan. Building ID: NONE Verification Group: LU Planner Verification Date: 12/05/2007 Verified By: HENRYNA Comments: This condition is waived for this demo permit, but will be required prior to issuance of other building permits. Confirmed with Colin Vasquez. Modified Date: 12/05/2007 Modification Details: EXCEPTION |
Condition Category: Prior to Construction Permit Issuance Condition Details: 2.Submit a completed drainage control plan that complies with SMC 22.802.020 B2d and Director's Rule 2000-16, (Category 2) BMPs for Construction Erosion and Sedimentation Control Plans. Adherence to the measures outlined in the attachment shall mitigate erosion and sedimentation impacts to Salmon Bay Waterway. Building ID: NONE Verification Group: LU Planner Verification Date: 12/05/2007 Verified By: HENRYNA Comments: This condtion is not required for this demo permit, but will be required for other building permits. Confirmed this with Colin Vasquez. Modified Date: 12/05/2007 Modification Details: EXCEPTION |
Condition Category: Prior to Construction Permit Issuance Condition Details: 3.The requirements of the US Army Corps of Engineers and the Washington State Department of Fisheries permits will be conditions of this permit. These requirements shall be included on the building plan set submitted for this project. Building ID: NONE Verification Group: LU Planner Verification Date: 12/05/2007 Verified By: HENRYNA Comments: This condition is not required for this demo permit but will be required for any other construction permit. Confirmed this with Colin Vasquez. Modified Date: 12/05/2007 Modification Details: EXCEPTION |
Condition Category: Prior to Construction Permit Issuance Condition Details: 4.The applicant shall provide DPD evidence of recorded easements necessary for pier structures and pier access across property and parcel boundaries. Building ID: NONE Verification Group: LU Planner Verification Date: 12/05/2007 Verified By: HENRYNA Comments: The easement is no longer required based on the revised site plan filed with B/P 6162566. Modified Date: 12/04/2007 Modification Details: MODIFICATION |
Condition Category: Prior to Construction Permit Issuance Condition Details: 5.All pier decks more than six (6) feet in width shall include a grating component for ambient light transmission. Building ID: NONE Verification Group: LU Planner Verification Date: 12/05/2007 Verified By: HENRYNA Comments: This condtion is not applicable for this demo permit. Modified Date: 12/05/2007 Modification Details: EXCEPTION |
|