PERMIT APPLICATION COMMON
Where on your property are you working?:
PARCEL A, SP#3007884; 8/22/14 MJ: ADDRESS CHANGED FROM 7325B
Choose the Primary Property Use:
Commercial
Project Value:
118307
PERMIT TRACKING COMMON
Review Level:
Full C
Application Completed Date:
12/19/2007
Permit Issued Date:
12/09/2014
Inspections Completed Date:
02/26/2016
Certificate of Occupancy Issued Date:
02/25/2016
Permit Remarks:
Project includes one curb cut that will be on both lots along the right of way. To construct and maintain one 20ft curb cut along 35th Ave NE beginning approximately 8ft south of the north property line and cont. on to the adjoining lot to the south.
CONSTRUCTION VALUATION INFO
Intake Value: New:
118307
Intake Value: Alteration:
0
Total Intake Value:
118307
Issue Value: New:
118307
Issue Value: Alteration:
0
Total Issued Value:
118307
BUILDING CODE INFO
What building code was used for your design?:
2009 SBC
Specific Building Code:
2009 SBC
Is this a substantial alteration?:
No
Action Type:
New
Number of Proposed Building Stories:
2
Number of Proposed Below-Grade Building Stories:
0
Number of Mezzanines:
0
Will you change the building use or occupancy?:
Yes
Is a certificate of occupancy required?:
Yes
GROUND DISTURBANCE
Land Disturbing Activity:
Yes
Are you doing more than 2,000 square feet of earth disturbance?:
Yes
LAND USE STREET ELEMENTS
Number of Curb Cuts for This Permit:
1
Tenant Relocation Assistance
Residential Unit Occupancy:
Unit(s) on Property Not Affected by Scope
WASTE DIVERSION
Waste Diversion Plan Required:
No
FIRE PROTECTION SYSTEMS
Sprinklers Meet NFPA 13:
Yes
EMERGENCY SYSTEMS
Are Emergency Systems Required for this Project?:
No
MECHANICAL CODE
Does your project include an HVAC mechanical system?:
No
ENERGY CODE
Compliance Category:
Commercial
Compliance Path:
Prescriptive
ENERGY EQUIPMENT
AFUE Efficiency (percentage):
0
HSPF Efficiency (percentage):
0
Heating Fuel Type Proposed: Non-Residential:
Unknown
SIDE SEWER INFORMATION
Pipe Lining in the Right-of-Way:
No
Curb Crossing and/or Staging:
No
Excavation:
No
Roadway Restoration:
No
DRAINAGE INFORMATION
Number of Service Drain Lines Capped:
0
Drainage Type of Work:
New
Number of New Drainage Connections to the Main:
0
Number of Other New Drainage Connections:
1
Number of Drainage New/Replaced/Repair Pumps:
0
Flow Control Type:
No Control
Treatment Standard Type:
No Treatment
Discharge Point:
Weep Hole
Total Disturbed Area:
99
New Impervious Surface:
99
New Plus Replaced Impervious Surface:
99
Total Volume Managed by On-Site Stormwater Management (gallons):
99
Total Area Requiring Soil Amendment:
99
SANITARY INFORMATION
Number of Service Sewer Lines Capped:
0
Sanitary Type of Work:
New
Number of New Sewer Connections to the Main:
0
Number of New Connections to the Side Sewer:
1
Number of Sewer New/Replaced/Repair Pumps:
0
Reuse Existing Side Sewer System:
No