LAND USE CONDITIONS |
Condition Category: During Construction Condition Details: 10.An all-way stop shall be installed at the intersection of Alaskan Way and the Galer Street Flyover, the design of which shall be subject to approval by the Seattle Department of Transportation (SDOT). Building ID: 000017470-BD Verification Group: LU Planner Verification Date: 03/18/2009 Verified By: VASQUEZ Comments: Life conditions. Verified by complaint. Modified Date: 03/18/2009 Modification Details: MODIFICATION |
Condition Category: During Construction Condition Details: 11.Equipment for the transportation, storage, handling and application of oil, chemicals, or other hazardous materials shall be maintained in a safe and leak-proof condition to prevent release of this material into the water. If there is any evidence of leakage, the further use of such equipment shall be suspended until the deficiency has been satisfactorily corrected. Building ID: 000017470-BD Verification Group: LU Planner Verification Date: 02/18/2009 Verified By: VASQUEZ |
Condition Category: During Construction Condition Details: 12.The owner(s), builder(s), or responsible party(s) shall follow the BMPs developed for the project to prevent debris and other deleterious material from entering the water during demolition and construction. Building ID: 000017470-BD Verification Group: LU Planner Verification Date: 02/18/2009 Verified By: VASQUEZ |
Condition Category: During Construction Condition Details: 13.If floating debris enters the water during the proposed work this debris shall be removed immediately and stored until it can be disposed of at an appropriate upland facility. Building ID: 000017470-BD Verification Group: LU Planner Verification Date: 02/18/2009 Verified By: VASQUEZ |
Condition Category: During Construction Condition Details: 14.If heavy (sinking) debris enters the water during the proposed work the location of the debris shall be documented. When construction is complete a diver shall retrieve all debris that has entered the water and sunk during the proposed work. Building ID: 000017470-BD Verification Group: LU Planner Verification Date: 02/18/2009 Verified By: VASQUEZ |
Condition Category: During Construction Condition Details: 15.Equipment using oil, gasoline, or diesel used on site shall be checked for evidence of leakage, if evidence of leakage is found the further use of such equipment shall be suspended until the deficiency has been satisfactorily corrected. Building ID: 000017470-BD Verification Group: LU Planner Verification Date: 02/18/2009 Verified By: VASQUEZ |
Condition Category: During Construction Condition Details: 16.If treated wood is proposed for other structures, this wood shall be professionally treated and completely cured using the best management practices developed by the Western Wood Preservers Institute (http://www.wwpinstitute.org/) before this wood is used for this project. Building ID: 000017470-BD Verification Group: LU Planner Verification Date: 02/18/2009 Verified By: VASQUEZ |
Condition Category: During Construction Condition Details: 17.Existing timber piles proposed to be removed shall be full extracted by direct pulling with a barge or vibratory hammer. Hydraulic water jetting shall not be permitted. Remaining pile shall be filled with clean sand. If an existing pile cannot be extracted, the pile shall be cut off two (2) feet below the mudline and capped with clean sand or covered with a plastic or steel cap to insure that chemicals from the existing pile do not leach in to the adjacent sediments. Building ID: 000017470-BD Verification Group: LU Planner Verification Date: 02/18/2009 Verified By: VASQUEZ |
Condition Category: During Construction Condition Details: 18.During pile removal, skirting or containment booms shall be used to isolate piles if visible turbidity or sheen from suspected wood treatment residue is noted. Absorbent pads shall be used to control areas of visible sheen. Building ID: 000017470-BD Verification Group: LU Planner Verification Date: 02/18/2009 Verified By: VASQUEZ |
Condition Category: During Construction Condition Details: 19.All creosote material, pile stubs, and associated sediments must be disposed of in a landfill which meets the liner and leachate standards of the Minimum Functional Standards, Chapter 173-304 WAC. Building ID: 000017470-BD Verification Group: LU Planner Verification Date: 02/18/2009 Verified By: VASQUEZ |
Condition Category: During Construction Condition Details: 20.Catchbasins shall be protected during demolition, construction and repaving to prevent any deleterious material from entering the water. Building ID: 000017470-BD Verification Group: LU Planner Verification Date: 02/18/2009 Verified By: VASQUEZ |
Condition Category: During Construction Condition Details: 21.All non-native vegetation in the riparian shoreline mitigation area shall be removed and all existing native vegetation shall remain. Only native vegetation shall be planted in planting areas 7-10 feet wide by 20 feet long and spaced 20 feet apart along the shoreline located along the 500-foot shoreline on the northwest corner of the North Bay of Smith Cove. Building ID: 000017470-BD Verification Group: LU Planner Verification Date: 03/18/2009 Verified By: VASQUEZ Comments: Life condition. Verified by complaint. Modified Date: 03/18/2009 Modification Details: MODIFICATION |
Condition Category: During Construction Condition Details: 22.The mitigated shallow subtidal habitat shall consist of clean fill and be placed over 0.36 acre from elevation -12 to -6 MLLW using a graded mixture of clean sand and naturally occurring round or sub-angular gravel. Building ID: 000017470-BD Verification Group: LU Planner Verification Date: 03/18/2009 Verified By: VASQUEZ Comments: Life condition by complaint. Modified Date: 03/18/2009 Modification Details: MODIFICATION |
Condition Category: During Construction Condition Details: 31.The contractor will be required to prevent spillage of concrete during the activities that involve use of uncured concrete. Building ID: 000017470-BD Verification Group: LU Planner Verification Date: 02/18/2009 Verified By: VASQUEZ |
Condition Category: During Construction Condition Details: 32.The contractor will be required to take measures to prevent any petroleum products, chemicals, or other toxic or deleterious materials from entering the water. Fuel hoses, oil drums, oil or fuel transfer valves and fittings, etc., will be checked regularly for drips or leaks, and shall be maintained and stored properly to prevent spills into State waters. Proper security shall also be maintained to prevent vandalism. Building ID: 000017470-BD Verification Group: LU Planner Verification Date: 02/18/2009 Verified By: VASQUEZ |
Condition Category: During Construction Condition Details: 33.The contractor will have a spill containment kit, including oil-absorbent materials, on site to be used in the event of a spill or if any oil product is observed in the water. Building ID: 000017470-BD Verification Group: LU Planner Verification Date: 02/18/2009 Verified By: VASQUEZ |
Condition Category: During Construction Condition Details: 34.If a spill were to occur, work would be stopped immediately, steps would be taken to contain the material, and appropriate agency notifications would be made. The contractor is responsible for the preparation of spill response and hazardous material control plans to be used for the duration of Project construction. Building ID: 000017470-BD Verification Group: LU Planner Verification Date: 02/18/2009 Verified By: VASQUEZ |
Condition Category: During Construction Condition Details: 35.Spills and/or conditions resulting in distressed or dying fish shall be reported immediately to Ecology's Northwest Regional Spill Response Office at (206) 649-7000 (a 24-hour phone number). Building ID: 000017470-BD Verification Group: LU Planner Verification Date: 02/18/2009 Verified By: VASQUEZ |
Condition Category: During Construction Condition Details: 36.If fish are observed in distress or a fish kill occurs, work would be stopped immediately. WDFW, Ecology and other necessary agencies would be contacted and work would not resume until further approval is given. Building ID: 000017470-BD Verification Group: LU Planner Verification Date: 02/18/2009 Verified By: VASQUEZ |
Condition Category: During Construction Condition Details: 37.A boom will be installed around the work area prior to removal of the timber piling and related structures to contain and collect debris. Debris will be disposed of at an approved upland location. Building ID: 000017470-BD Verification Group: LU Planner Verification Date: 02/18/2009 Verified By: VASQUEZ |
Condition Category: During Construction Condition Details: 38.Extracted fender piling will be pulled from the water directly and placed on a receiving barge or on the adjacent concrete apron deck immediately in order to minimize release of any adhering sediment back into the water. Building ID: 000017470-BD Verification Group: LU Planner Verification Date: 02/18/2009 Verified By: VASQUEZ |
Condition Category: During Construction Condition Details: 39.Extracted piling will not be rinsed or washed in or above the aquatic area in any way. Building ID: 000017470-BD Verification Group: LU Planner Verification Date: 02/18/2009 Verified By: VASQUEZ |
Condition Category: During Construction Condition Details: 40.The receiving barge or pier site on which the extracted piling are placed will be fitted for control of drainage, such that any sediment or creosote treated wood fragments present on the extracted fender piling will be contained. The containment basin will be sufficiently durable to function as a continuous confinement mechanism. Building ID: 000017470-BD Verification Group: LU Planner Verification Date: 02/18/2009 Verified By: VASQUEZ |
Condition Category: During Construction Condition Details: 41.The receiving barge or pier site on which the extracted piling are placed will be fitted for control of drainage, such that any sediment or creosote treated wood fragments present on the extracted fender piling will be contained. The containment basin will be sufficiently durable to function as a continuous confinement mechanism. Building ID: 000017470-BD Verification Group: LU Planner Verification Date: 02/18/2009 Verified By: VASQUEZ |
Condition Category: During Construction Condition Details: 42.Construction of the proposed project will comply with water quality restrictions imposed by the Washington State Department of Ecology (Ecology) in its 401 Water Quality Certification. Building ID: 000017470-BD Verification Group: LU Planner Verification Date: 02/18/2009 Verified By: VASQUEZ |
Condition Category: During Construction Condition Details: 43.An on-site inspector will be present during construction to ensure contract and permit compliance. The inspector and the contractor each have a copy of Contract Plans and Specifications on site and will be aware of all permit requirements. Building ID: 000017470-BD Verification Group: LU Planner Verification Date: 02/18/2009 Verified By: VASQUEZ |
Condition Category: During Construction Condition Details: 44.The dredging contractor will inspect fuel hoses, oil or fuel transfer valves and fittings on a regular basis for drips or leaks in order to prevent spills into the surface water. Building ID: 000017470-BD Verification Group: LU Planner Verification Date: 02/18/2009 Verified By: VASQUEZ |
Condition Category: During Construction Condition Details: 45.The contractor will be responsible for the preparation of a SPCC (Spill Prevention Control and Countermeasures) Plan to be used for the duration of the project. The plan will be submitted to the Project Engineer prior to the commencement of any construction activities. A copy of the plan with any updates will be maintained at the work site by the contractor. Building ID: 000017470-BD Verification Group: LU Planner Verification Date: 02/18/2009 Verified By: VASQUEZ |
Condition Category: During Construction Condition Details: 46.The SPCC Plan will identify construction planning elements and recognize potential spill sources at the site. The SPCC Plan will outline responsive actions in the event of a spill or release and shall identify notification and reporting procedures. The SPCC Plan shall also outline contractor management elements such as personnel responsibilities, project site security, site inspections, and training. Building ID: 000017470-BD Verification Group: LU Planner Verification Date: 02/18/2009 Verified By: VASQUEZ |
Condition Category: During Construction Condition Details: 47.The SPCC Plan will outline what measures shall be taken by the contractor to prevent the release or spread of hazardous materials, either found on site and encountered during construction but not identified in contract documents, or any hazardous materials that the contractor stores, uses, or generates on the construction site during construction activities. These items include, but are not limited to, gasoline, oils, and chemicals. Hazardous materials are defined in RCW 70.105.010 under "hazardous substance." Building ID: 000017470-BD Verification Group: LU Planner Verification Date: 02/18/2009 Verified By: VASQUEZ |
Condition Category: During Construction Condition Details: 48.The contractor shall maintain, at the job site, the applicable equipment and material designated in the SPCC plan. Building ID: 000017470-BD Verification Group: LU Planner Verification Date: 02/18/2009 Verified By: VASQUEZ |
Condition Category: During Construction Condition Details: 49.Excess or waste materials will not be disposed of or abandoned waterward of Ordinary High Water (OHW) or allowed to enter waters of the State. All dredge materials will be disposed at a DMMP approved open water disposal site or at an approved upland landfill site depending upon the suitability of the material. Building ID: 000017470-BD Verification Group: LU Planner Verification Date: 02/18/2009 Verified By: VASQUEZ |
Condition Category: During Construction Condition Details: 50.The dredged material will be offloaded from the barge by mechanical methods (e.g., crane or backhoe), and placed into stockpiles for dewatering or directly into truck or rail cars for transport to an approved upland landfill facility. Free water associated with the offloading, stockpiling, and dewatering activities will be captured and discharged back into receiving waters (if the effluent meets State water quality criteria) or discharged into a Publicly Owned Treatment Works (POTW). Building ID: 000017470-BD Verification Group: LU Planner Verification Date: 02/18/2009 Verified By: VASQUEZ |
Condition Category: During Construction Condition Details: 51.Appropriate BMPs will be employed to minimize sediment loss and turbidity generation during offloading and stockpiling of unsuitable sediment at the offloading/stockpile site, including: (1) providing a spill plate or similar to prevent sediment loss during barge offloading, (2) enclosing the stockpile area to ensure sediment is not lost from the stockpile, (3) collecting and treating effluent from the stockpile to prevent suspended sediment loss during effluent discharge to receiving waters or to a Publicly Owned Treatment Works (POTW). Building ID: 000017470-BD Verification Group: LU Planner Verification Date: 02/18/2009 Verified By: VASQUEZ |
Condition Category: During Construction Condition Details: 52.For unsuitable sediment, effluent coming from the dewatering process would be treated for compliance with state water quality standards and then released back into the receiving water. If the Water Quality Certification specifies otherwise, the effluent would be disposed at an approved Publicly Owned Treatment Works (POTW). No effects to water quality would result from this activity. Building ID: 000017470-BD Verification Group: LU Planner Verification Date: 02/18/2009 Verified By: VASQUEZ |
Condition Category: During Construction Condition Details: 53.Construction designs shall identify the locations of known soil and groundwater contamination and provide specifications to guide management of contaminated soil and groundwater (testing, treatment, and/or disposal) to minimize inadvertent release of contaminants to the environment. Building ID: 000017470-BD Verification Group: LU Planner Verification Date: 02/18/2009 Verified By: VASQUEZ |
Condition Category: During Construction Condition Details: 54.Plans to address unanticipated contamination discovered during construction shall be developed and implemented. Such plans shall include notification requirements in the event suspicious conditions are encountered, safety procedures, and response actions. The plans and specifications shall be designed to provide for worker health and safety and to minimize cost and schedule impacts. The plans shall include the safety requirements of WAC 296-843, Hazardous Waste Operations, and response actions that either remove, treat, or contain the contamination or, at a minimum, do not preclude future removal, treatment, or containment of the contamination. The plans shall also include spill response Building ID: 000017470-BD Verification Group: LU Planner Verification Date: 02/18/2009 Verified By: VASQUEZ |
Condition Category: During Construction Condition Details: 55.Should contamination be encountered during construction, cleanup action goals to be achieved through removal, treatment, and/or containment of hazardous materials shall be established provisions based on evaluation of the most appropriate cleanup method based on evaluation criteria contained in the MTCA regulations. Building ID: 000017470-BD Verification Group: LU Planner Verification Date: 02/18/2009 Verified By: VASQUEZ |
Condition Category: During Construction Condition Details: 56.Standard dust control measures (e.g., water application) shall be used during construction to limit the generation of airborne dust which, if inhaled by site workers or the surrounding population, could potentially result in exposure of hazardous material. Building ID: 000017470-BD Verification Group: LU Planner Verification Date: 02/18/2009 Verified By: VASQUEZ |
Condition Category: During Construction Condition Details: 57.Contaminated soil shall be disposed of at facilities permitted to manage the type of soil that is present at the site and in a manner consistent with the requirements of the Solid Waste Regulations (WAC 173-350) and State Dangerous Waste Regulations (WAC 173-303). Soil may be treated in place if removal is not feasible. Building ID: 000017470-BD Verification Group: LU Planner Verification Date: 02/18/2009 Verified By: VASQUEZ |
Condition Category: During Construction Condition Details: 58.Dewatering discharges shall be monitored to assess the quality and will provide for treatment, if needed, and compliance with applicable discharge permits for short-term (i.e., construction dewatering) and any long-term (operational dewatering) discharges. If necessary, investigate whether excavations which require dewatering will intercept groundwater contamination. Building ID: 000017470-BD Verification Group: LU Planner Verification Date: 02/18/2009 Verified By: VASQUEZ |
Condition Category: During Construction Condition Details: 59.Appropriate shields on exterior lighting fixtures shall be used to reduce light spillage. Security lighting shall be directed away from adjacent residential areas to the north and west. Building ID: 000017470-BD Verification Group: LU Planner Verification Date: 02/18/2009 Verified By: VASQUEZ |
Condition Category: During Construction Condition Details: 60.Low-reflectivity building glazing and building materials shall be incorporated into the design. Building ID: 000017470-BD Verification Group: LU Planner Verification Date: 02/18/2009 Verified By: VASQUEZ |
Condition Category: During Construction Condition Details: 61.To limit the amount of lighting adjacent to the shoreline areas of the site, light fixtures shall be focused downward to walkways and away from the aquatic environment. Building ID: 000017470-BD Verification Group: LU Planner Verification Date: 02/18/2009 Verified By: VASQUEZ |
Condition Category: During Construction Condition Details: 62.Exterior lighting on homeporting cruise ships shall be low-intensity and shielded and be directed away form aquatic areas. Building ID: 000017470-BD Verification Group: LU Planner Verification Date: 02/18/2009 Verified By: VASQUEZ |
Condition Category: During Construction Condition Details: 63.A professional archaeologist shall be available during ground-disturbing activities if subgrade excavations will be deep enough to intersect intact tide flat surfaces below the fill at P-91. An Archaeological Construction Monitoring and Discovery Plan shall be prepared for subgrade excavations that are expected to reach lower than fill level. Building ID: 000017470-BD Verification Group: LU Planner Verification Date: 02/18/2009 Verified By: VASQUEZ |
Condition Category: During Construction Condition Details: 64.The Port shall install directional signage to direct passengers to the cruise ship terminal. The Port should work with Seattle Department of Transportation (SDOT) to approve the design and location of these signs. Building ID: 000017470-BD Verification Group: LU Planner Verification Date: 03/18/2009 Verified By: VASQUEZ Comments: Life condition. Verified by complaint. Modified Date: 03/18/2009 Modification Details: MODIFICATION |
Condition Category: During Construction Condition Details: 8.A Section 10 Permit from the Army Corps of Engineers and a Hydraulic Project Approval Permit from Washington Department of Fish and Wildlife shall be successfully obtained and the terms and conditions of each permit shall be followed. Building ID: 000017470-BD Verification Group: LU Planner Verification Date: 02/18/2009 Verified By: VASQUEZ |
Condition Category: During Construction Condition Details: 9.Epibenthic and benthic sampling shall be conducted on the habitat west of the West Berth dredge site in the -10 to -6 MLLW prior to dredging. Building ID: 000017470-BD Verification Group: LU Planner Verification Date: 02/18/2009 Verified By: VASQUEZ |
Condition Category: Prior to Construction Permit Final/CofO Condition Details: 23.Epibenthic and benthic sampling shall be conducted in the created shallow subtidal habitat area and submitted to DPD. Building ID: 000017470-BD Verification Group: LU Planner Verification Date: 02/18/2009 Verified By: VASQUEZ |
Condition Category: Prior to Construction Permit Final/CofO Condition Details: 24.The Port shall monitor the riparian plantings for 5 years to ensure 90% survival the planted trees and shrubs. The Port shall also monitor yearly the propwash areas outlined in the Revised Mitigation Plan, May 2007. Building ID: 000017470-BD Verification Group: LU Planner Verification Date: 03/18/2009 Verified By: VASQUEZ Comments: Life condition. Verified by complaint. Modified Date: 03/18/2009 Modification Details: MODIFICATION |
Condition Category: Prior to Construction Permit Final/CofO Condition Details: 25.The Port shall submit a report to DPD each year that monitoring activities occur outlining the results of the monitoring activities with photographs and conclusions regarding the performance standards for the Mitigation Areas. Building ID: 000017470-BD Verification Group: LU Planner Verification Date: 03/18/2009 Verified By: VASQUEZ Comments: Life condition. Verified by complaint. Modified Date: 03/18/2009 Modification Details: MODIFICATION |
Condition Category: Prior to Construction Permit Issuance Condition Details: 3.An epibenthic and benthic invertebrate study plan shall be developed for the dredge and mitigation areas and submitted to DPD for approval. Building ID: 000017470-BD Verification Group: LU Planner Verification Date: 10/12/2007 Verified By: GLOWACM |
Condition Category: Prior to Construction Permit Issuance Condition Details: 4.the construction plan sets shall be updated to reflect the following;"the Landscaping Planting Plan dated May 9, 2007 (on the MUP)."the revised dredging plan in the west berth only Building ID: 000017470-BD Verification Group: LU Planner Verification Date: 10/12/2007 Verified By: GLOWACM |
Condition Category: Prior to Construction Permit Issuance Condition Details: 5.The Revised Mitigation Plan, dated May 2007, shall incorporate the Revised Contingency Planning Process Flowchart which includes propwash monitoring (Figure 2). Building ID: 000017470-BD Verification Group: LU Planner Verification Date: 10/12/2007 Verified By: GLOWACM |
Condition Category: Prior to Construction Permit Issuance Condition Details: 6.Submit a completed drainage control plan that complies with SMC 22.802.020 B2d and Director's Rule 2000-16, (Category 2) BMPs for Construction Erosion and Sedimentation Control Plans. Adherence to the measures outlined in the attachment shall mitigate erosion and sedimentation impacts to Salmon Bay Waterway. Building ID: 000017470-BD Verification Group: LU Planner Verification Date: 10/12/2007 Verified By: GLOWACM |
Condition Category: Prior to Construction Permit Issuance Condition Details: 7.Prior to commencing construction, an emergency containment plan and procedures shall be developed for all toxic material that will be kept on site. All necessary equipment for containment and clean-up of this toxic material should be stocked on the site. A sufficient number of personnel, both during construction and during on-going operations, shall be trained in the proper implementation of this plan. Building ID: 000017470-BD Verification Group: LU Planner Verification Date: 10/12/2007 Verified By: GLOWACM |
|