PERMIT APPLICATION COMMON
Choose the Primary Property Use:
Multifamily
Project Value:
400000
PERMIT TRACKING COMMON
Review Level:
Full C
Application Completed Date:
06/17/2014
Permit Issued Date:
10/23/2014
Inspections Completed Date:
04/21/2016
Permit Remarks:
1/6/06 sb: address on A/P changed from 2538 E Madison St. Install two curb cuts along the westside of 26th Ave E, approxiamtely 30 feet apart from each other and 15 feet south property line. Separate street use permit required.
CONSTRUCTION VALUATION INFO
Intake Value: New:
400000
Intake Value: Alteration:
0
Total Intake Value:
400000
Issue Value: New:
400000
Issue Value: Alteration:
0
Total Issued Value:
400000
BUILDING CODE INFO
What building code was used for your design?:
2012 SRC
Specific Building Code:
2012 SRC
Is this a substantial alteration?:
No
Action Type:
New
Number of Proposed Building Stories:
2
Number of Proposed Below-Grade Building Stories:
1
Number of Mezzanines:
0
Is this a high-rise?:
No
Will you change the building use or occupancy?:
No
Is a certificate of occupancy required?:
No
GROUND DISTURBANCE
Land Disturbing Activity:
Yes
Are you doing more than 2,000 square feet of earth disturbance?:
Yes
LAND USE STREET ELEMENTS
Number of Curb Cuts for This Permit:
2
Tenant Relocation Assistance
Residential Unit Occupancy:
Unit(s) on Property Not Affected by Scope
WASTE DIVERSION
Waste Diversion Plan Required:
No
EMERGENCY SYSTEMS
Are Emergency Systems Required for this Project?:
No
MECHANICAL CODE
Does your project include an HVAC mechanical system?:
No
ENERGY CODE
Compliance Category:
Residential
Compliance Path:
Prescriptive
ENERGY EQUIPMENT
AFUE Efficiency (percentage):
0
HSPF Efficiency (percentage):
0
Heating Fuel Type Proposed: Residential:
Electric Heat Pump
Cooling Fuel Type Proposed: Residential:
Electric Heat Pump
SIDE SEWER INFORMATION
Pipe Lining in the Right-of-Way:
No
Curb Crossing and/or Staging:
No
Excavation:
No
Roadway Restoration:
No
DRAINAGE INFORMATION
Number of Service Drain Lines Capped:
0
Drainage Type of Work:
New
Number of New Drainage Connections to the Main:
0
Number of Other New Drainage Connections:
1
Number of Drainage New/Replaced/Repair Pumps:
0
Flow Control Type:
No Control
Flow Control Standard:
Peak
Treatment Standard Type:
No Treatment
Discharge Point:
Combined System
Total Disturbed Area:
2500
New Impervious Surface:
1643
New Plus Replaced Impervious Surface:
0
Total Volume Managed by On-Site Stormwater Management (gallons):
210
Total Area Requiring Soil Amendment:
857
SANITARY INFORMATION
Number of Service Sewer Lines Capped:
0
Sanitary Type of Work:
New
Number of New Sewer Connections to the Main:
1
Number of New Connections to the Side Sewer:
0
Number of Sewer New/Replaced/Repair Pumps:
0
Reuse Existing Side Sewer System:
No