PERMIT APPLICATION COMMON
Where on your property are you working?:
northwest portion of site
Is work in the right-of-way (street or alley) required?:
No
Choose the Primary Property Use:
Commercial
Project Value:
0
PERMIT TRACKING COMMON
Review Level:
Full +
Application Completed Date:
08/19/2024
Permit Issued Date:
09/10/2024
Permit Remarks:
Building permit issuance is required prior to final inspection for this demolition permit; or all disturbed areas shall be fully stabilized, and side sewers shall be capped.
FLOATING RESIDENCE INFO
Is this building a Floating Residence?:
No
SIDE SEWER INFORMATION
Temporary Dewatering for Construction:
No
Pipe Lining on Private Property:
No
Pipe Lining in the Right-of-Way:
No
Side Sewer Conflict Description:
Cut and cap sewer at property line for demolition of building
Is the system required by the Department of Ecology?:
No
Curb Crossing and/or Staging:
No
Excavation:
No
Curb and Sidewalk Restoration?:
No
Roadway Restoration:
No
DRAINAGE INFORMATION
Number of Service Drain Lines Capped:
1
Drainage Type of Work:
Capping Only
SANITARY INFORMATION
Number of Service Sewer Lines Capped:
1
Sanitary Type of Work:
Capping Only
Reuse Existing Side Sewer System:
No
SIDE SEWER STREET USE INFO
Do you want us to create an SDOT permit application for you, for restoration or staging related to the SDCI Side Sewer permit?:
No
Do you have an existing SDOT permit related to your side sewer work?:
yes
What is the estimated start date of work in the ROW?:
11/11/2024
What is the estimated duration of work in the ROW (in calendar days)?:
0