PERMIT APPLICATION COMMON
Where on your property are you working?:
Storm and sewer enter the property at west property line and continue eastward to the new construction buildings.
Is work in the right-of-way (street or alley) required?:
Yes
Choose the Primary Property Use:
Multifamily
Project Value:
7000000.00
PERMIT TRACKING COMMON
Review Level:
Field
Application Completed Date:
09/03/2024
Permit Issued Date:
09/03/2024
FLOATING RESIDENCE INFO
Is this building a Floating Residence?:
No
SIDE SEWER INFORMATION
Related New Construction Project:
6827500
Temporary Dewatering for Construction:
No
Curb Crossing and/or Staging:
Yes
Excavation:
Yes
Curb and Sidewalk Restoration?:
Yes
Roadway Restoration:
Yes
SIDE SEWER STREET USE INFO
Do you want us to create an SDOT permit application for you, for restoration or staging related to the SDCI Side Sewer permit?:
No
DRAINAGE INFORMATION
Drainage Type of Work:
New
Number of New Drainage Connections to the Main:
1
Flow Control Type:
No Control
Flow Control Standard:
None
Treatment Standard Type:
Basic
Discharge Point:
Storm System
Total Disturbed Area:
19860
New Impervious Surface:
12058
New Plus Replaced Impervious Surface:
13802
Total Volume Managed by On-Site Stormwater Management (gallons):
115078
Total Area Requiring Soil Amendment:
6058
SANITARY INFORMATION
Sanitary Type of Work:
New
Number of New Connections to the Side Sewer:
1
Number of New Dwelling Units:
7
Reuse Existing Side Sewer System:
Yes