PERMIT APPLICATION COMMON
Is work in the right-of-way (street or alley) required?:
Yes
Choose the Primary Property Use:
Multifamily
Project Value:
100000
PERMIT TRACKING COMMON
Review Level:
Field
Application Completed Date:
02/21/2024
Permit Issued Date:
03/19/2024
FLOATING RESIDENCE INFO
Is this building a Floating Residence?:
No
SIDE SEWER INFORMATION
Related New Construction Project:
6909670
Temporary Dewatering for Construction:
No
Curb Crossing and/or Staging:
Yes
Excavation:
Yes
Curb and Sidewalk Restoration?:
Yes
Roadway Restoration:
Yes
SIDE SEWER STREET USE INFO
Do you want us to create an SDOT permit application for you, for restoration or staging related to the SDCI Side Sewer permit?:
Yes
Do you have an existing SDOT permit related to your side sewer work?:
SUUTIL0019878
What is the estimated start date of work in the ROW?:
02/26/2024
What is the estimated duration of work in the ROW (in calendar days)?:
10
DRAINAGE INFORMATION
Drainage Type of Work:
New
Number of New Drainage Connections to the Main:
1
Flow Control Type:
No Control
Flow Control Standard:
None
Treatment Standard Type:
No Treatment
Discharge Point:
Storm System
Discharge Point Other Type:
(10th Ave E)
Total Disturbed Area:
4800
New Impervious Surface:
594
New Plus Replaced Impervious Surface:
3195
Total Volume Managed by On-Site Stormwater Management (gallons):
31726
Total Area Requiring Soil Amendment:
662
SANITARY INFORMATION
Number of Service Sewer Lines Capped:
1
Sanitary Type of Work:
New
Number of New Sewer Connections to the Main:
1
Number of New Dwelling Units:
8
Reuse Existing Side Sewer System:
No