PERMIT APPLICATION COMMON
Where on your property are you working?:
West side of 15th Ave NW
Is work in the right-of-way (street or alley) required?:
Yes
Choose the Primary Property Use:
Multifamily
Project Value:
25000000
PERMIT TRACKING COMMON
Review Level:
Field
Application Completed Date:
12/12/2023
Permit Issued Date:
12/12/2023
FLOATING RESIDENCE INFO
Is this building a Floating Residence?:
No
SIDE SEWER INFORMATION
Related New Construction Project:
6815778
Temporary Dewatering for Construction:
No
Pipe Lining on Private Property:
Yes
Pipe Lining in the Right-of-Way:
Yes
Side Sewer Conflict:
No
Is the system required by the Department of Ecology?:
No
Curb Crossing and/or Staging:
Yes
Excavation:
Yes
Curb and Sidewalk Restoration?:
Yes
Roadway Restoration:
Yes
SIDE SEWER STREET USE INFO
Do you want us to create an SDOT permit application for you, for restoration or staging related to the SDCI Side Sewer permit?:
Yes
DRAINAGE INFORMATION
Drainage Type of Work:
New
Number of New Drainage Connections to the Main:
1
Number of Drainage New/Replaced/Repair Pumps:
1
Flow Control Type:
Vault
Flow Control Standard:
Peak
Treatment Standard Type:
No Treatment
Discharge Point:
Combined System
Total Disturbed Area:
29478
New Impervious Surface:
0
New Plus Replaced Impervious Surface:
29208
Total Volume Managed by On-Site Stormwater Management (gallons):
99795
Total Area Requiring Soil Amendment:
270
SANITARY INFORMATION
Sanitary Type of Work:
New
Number of New Sewer Connections to the Main:
1
Number of New Connections to the Side Sewer:
1
Number of New Dwelling Units:
194
Reuse Existing Side Sewer System:
Yes