PERMIT APPLICATION COMMON
Where on your property are you working?:
Work occurs within King County Utility Easement, within property line, at Southeast part of property
Is work in the right-of-way (street or alley) required?:
No
Choose the Primary Property Use:
Multifamily
Project Value:
140000
PERMIT TRACKING COMMON
Review Level:
Field
Application Completed Date:
09/08/2023
Permit Issued Date:
09/08/2023
FLOATING RESIDENCE INFO
Is this building a Floating Residence?:
No
SIDE SEWER INFORMATION
Related New Construction Project:
6769232
Temporary Dewatering for Construction:
No
Pipe Lining on Private Property:
No
Pipe Lining in the Right-of-Way:
No
Side Sewer Conflict:
No
Is the system required by the Department of Ecology?:
No
Curb Crossing and/or Staging:
Yes
Excavation:
No
Curb and Sidewalk Restoration?:
No
Roadway Restoration:
No
SIDE SEWER STREET USE INFO
Do you want us to create an SDOT permit application for you, for restoration or staging related to the SDCI Side Sewer permit?:
Yes
Do you have an existing SDOT permit related to your side sewer work?:
SUUTIL0016943
What is the estimated start date of work in the ROW?:
10/02/2023
What is the estimated duration of work in the ROW (in calendar days)?:
15
DRAINAGE INFORMATION
Drainage Type of Work:
New
Number of Other New Drainage Connections:
1
Flow Control Type:
Vault
Flow Control Standard:
Peak
Treatment Standard Type:
No Treatment
Discharge Point:
Combined System
Total Disturbed Area:
37532
New Impervious Surface:
30258
New Plus Replaced Impervious Surface:
33604
Total Volume Managed by On-Site Stormwater Management (gallons):
141481
Total Area Requiring Soil Amendment:
3928
SANITARY INFORMATION
Sanitary Type of Work:
New
Number of New Sewer Connections to the Main:
2
Number of New Dwelling Units:
351
Reuse Existing Side Sewer System:
No