PERMIT APPLICATION COMMON
Where on your property are you working?:
The entire property will be developed with new construction including below grade.
Is work in the right-of-way (street or alley) required?:
No
Choose the Primary Property Use:
Multifamily
Project Value:
84268846
CONSTRUCTION VALUATION INFO
Intake Value: New:
84268846
Intake Value: Alteration:
0
Total Intake Value:
84268846
Total Issued Value:
0
BUILDING CODE INFO
What building code was used for your design?:
2018 SBC (Struct) and SRC (Arch)
Is this a substantial alteration?:
No
Are you changing the envelope?:
No
Action Type:
New
Is this a high-rise?:
No
Will your application include a new standard plan?:
No
Is a certificate of occupancy required?:
No
GROUND DISTURBANCE
Is the ground disturbance in an environmentally critical area?:
Yes
New and Replaced Hard Surface > 750 sq ft?:
Yes
What is the amount of ground disturbance?:
Yes
I, the owner or owner’s authorized representative of the property referenced in this submission, give the City of Seattle Department of Planning and Development permission to conduct a Pre-Application Site Visit. I agree that: 1) electronic filing constitutes an authorizing signature; 2) I will inform all tenants of the site visit prior to the inspection being conducted; and 3) if conditions such as uncontrolled dogs or uncooperative tenants hinder the inspector’s ability to conduct the site visit, the site visit will not occur and the site visit fee may be forfeited.:
Yes
Foundation Type:
Basement
PERMIT TRACKING COMMON
Review Level:
Full C
PARKING
Number of Existing Onsite Parking Spaces:
6
Number of Existing Accessible Parking Spaces:
0
Number of Proposed Onsite Parking Spaces:
195
Number of Existing Bicycle Parking Spots:
0
Tenant Relocation Assistance
Residential Unit Occupancy:
No Residential Units on Property
FIRE PROTECTION SYSTEMS
Sprinklers Meet NFPA 13:
Yes
ENERGY CODE
Is any portion of the building semi-heated or unheated?:
Yes
Is there a fume hood?:
No
Is there a spray paint booth?:
No
SPECIAL PROGRAMS
Is this project receiving Opportunity Zone Funds?:
No