PERMIT APPLICATION COMMON
Where on your property are you working?:
5th Avenue side of the property, se corner of the existing building
Is work in the right-of-way (street or alley) required?:
Yes
Choose the Primary Property Use:
Commercial
Project Value:
0
PERMIT TRACKING COMMON
Review Level:
Field
Application Completed Date:
11/14/2022
Permit Issued Date:
11/14/2022
FLOATING RESIDENCE INFO
Is this building a Floating Residence?:
No
SIDE SEWER INFORMATION
Related New Construction Project:
6699514
Temporary Dewatering for Construction:
No
Pipe Lining on Private Property:
No
Pipe Lining in the Right-of-Way:
No
Side Sewer Conflict:
No
Is the system required by the Department of Ecology?:
No
Curb Crossing and/or Staging:
Yes
Excavation:
Yes
Curb and Sidewalk Restoration?:
Yes
Roadway Restoration:
No
DRAINAGE INFORMATION
Number of Service Drain Lines Capped:
0
Drainage Type of Work:
None
SANITARY INFORMATION
Number of Service Sewer Lines Capped:
1
Sanitary Type of Work:
Capping Only
Number of New Sewer Connections to the Main:
0
Number of New Connections to the Side Sewer:
0
Number of Sewer New/Replaced/Repair Pumps:
0
Number of New Dwelling Units:
0
Reuse Existing Side Sewer System:
No
SIDE SEWER STREET USE INFO
Do you want us to create an SDOT permit application for you, for restoration or staging related to the SDCI Side Sewer permit?:
Yes
Do you have an existing SDOT permit related to your side sewer work?:
SUUTIL0012292
What is the estimated start date of work in the ROW?:
11/15/2022
What is the estimated duration of work in the ROW (in calendar days)?:
2