PERMIT APPLICATION COMMON
Where on your property are you working?:
Along the property line on 1st Ave
Is work in the right-of-way (street or alley) required?:
No
Choose the Primary Property Use:
Institutional
Project Value:
0
PERMIT TRACKING COMMON
Review Level:
Field
Application Completed Date:
05/04/2022
Permit Issued Date:
05/05/2022
FLOATING RESIDENCE INFO
Is this building a Floating Residence?:
No
SIDE SEWER STREET USE INFO
Do you want us to create an SDOT permit application for you, for restoration or staging related to the SDCI Side Sewer permit?:
No
Do you have an existing SDOT permit related to your side sewer work?:
6869478-DM
SIDE SEWER INFORMATION
Related New Construction Project:
6856236
Temporary Dewatering for Construction:
No
DRAINAGE INFORMATION
Drainage Type of Work:
New
Number of Other New Drainage Connections:
1
Flow Control Type:
No Control
Flow Control Standard:
None
Treatment Standard Type:
No Treatment
Discharge Point:
Combined System
Total Disturbed Area:
4080
New Impervious Surface:
783
New Plus Replaced Impervious Surface:
1720
Total Volume Managed by On-Site Stormwater Management (gallons):
23810
Total Area Requiring Soil Amendment:
1577
SANITARY INFORMATION
Sanitary Type of Work:
New
Number of New Connections to the Side Sewer:
1
Number of New Dwelling Units:
2
Reuse Existing Side Sewer System:
Yes