PERMIT APPLICATION COMMON
Where on your property are you working?:
Onsite
Is work in the right-of-way (street or alley) required?:
Yes
Choose the Primary Property Use:
Multifamily
Project Value:
25000000
PERMIT TRACKING COMMON
Review Level:
Full C
Application Completed Date:
05/17/2023
Permit Remarks:
Address changed from 1205 NE 50th ST to 4750 45th Ave NE. slm 7/14/2023
FLOATING RESIDENCE INFO
Is this building a Floating Residence?:
No
CONSTRUCTION VALUATION INFO
Intake Value: New:
74935874
Intake Value: Alteration:
0
Total Intake Value:
74935874
Issue Value: New:
0
Issue Value: Alteration:
0
Total Issued Value:
0
Total Revision Value:
0
INTERDEPARTMENTAL COORDINATION
SDOT Concept Approval:
Yes
SDOT SIP PM:
Jackson Koch
BUILDING CODE INFO
What building code was used for your design?:
2018 SBC
Is this a substantial alteration?:
No
Are you changing the envelope?:
No
Action Type:
New
Number of Existing Building Stories:
1
Number of Existing Below-Grade Building Stories:
0
Number of Proposed Building Stories:
25
Number of Proposed Below-Grade Building Stories:
1
Number of Mezzanines:
0
Is this a high-rise?:
Yes
Will you change the building use or occupancy?:
No
Main Existing Use of Building:
Mercantile
Existing Occupancy:
M Retail
Will your application include a new standard plan?:
No
Does your project qualify for our Priority Green Incentive program?:
Expedited
Is a certificate of occupancy required?:
Yes
GROUND DISTURBANCE
Is your development site in an environmentally critical area (ECA)?:
No
New and Replaced Hard Surface > 750 sq ft?:
Yes
Are you doing more than 2,000 square feet of earth disturbance?:
Yes
I, the owner or owner’s authorized representative of the property referenced in this submission, give the City of Seattle Department of Planning and Development permission to conduct a Pre-Application Site Visit. I agree that: 1) electronic filing constitutes an authorizing signature; 2) I will inform all tenants of the site visit prior to the inspection being conducted; and 3) if conditions such as uncontrolled dogs or uncooperative tenants hinder the inspector’s ability to conduct the site visit, the site visit will not occur and the site visit fee may be forfeited.:
Yes
Foundation Type:
Spread Footing
LAND USE STREET ELEMENTS
Number of Curb Cuts for This Permit:
0
PARKING
# of Existing Onsite Parking:
0
# of Existing Offsite Parking:
0
# of Existing Accessible Parking:
0
# of Proposed Onsite Parking:
0
# of Proposed Offsite Parking:
0
Offsite Parking Location:
0
# of Proposed Accessible Parking:
0
# of Existing Bicycle Parking Spots:
0
# of Proposed Bicycle Parking Spots:
0
Tenant Relocation Assistance
Residential Unit Occupancy:
No Residential Units on Property
WASTE DIVERSION
Waste Diversion Plan Required:
No
FIRE PROTECTION SYSTEMS
Sprinklers Meet NFPA 13:
Yes
Sprinklers Meet NFPA 13R:
No
Partial Fire Protection System:
No
Fire Alarm:
Yes
Other Fire Protection System:
No
EMERGENCY SYSTEMS
Are Emergency Systems Required for this Project?:
Yes
Elevator Pressurization:
Yes
Stairway Pressurization:
Yes
Smoke Removal System:
No
Accessible Elevator Egress:
Yes
MECHANICAL CODE
Does your project include an HVAC mechanical system?:
Yes
MECHANICAL DUCTWORK LOCATION
Is there any equipment inside?:
Yes
Is there any rooftop equipment? :
Yes
ENERGY CODE
Is any portion of the building semi-heated or unheated?:
Yes
Compliance Category:
Commercial
Compliance Path:
Total Building Performance (TBP)
Is there a commercial kitchen hood exhaust system?:
Yes
Is there a fume hood?:
No
Is there a spray paint booth?:
No
ENERGY EQUIPMENT
Heating Fuel Type Proposed: Residential:
Electric Heat Pump
Cooling Fuel Type Proposed: Residential:
Electric Heat Pump
Heating Fuel Type Proposed: Non-Residential:
Electric Heat Pump
Special Requirements:
Wastewater heat recovery+Air source heat pump+ HVAC condenser loop preheat for hot domestic hot water heating. BPF 6% (0.49 multifamily, 0.40 retail) better than c407 for Priority Green (Jess H E mail). PCI-0.59, PCIt-0.61
DRAINAGE INFORMATION
Drainage Type of Work:
New
Number of New Drainage Connections to the Main:
1
Flow Control Type:
No Control
Flow Control Standard:
None
Treatment Standard Type:
No Treatment
Discharge Point:
Storm System
Total Disturbed Area:
14216
New Impervious Surface:
0
New Plus Replaced Impervious Surface:
14021
Total Volume Managed by On-Site Stormwater Management (gallons):
24022
Total Area Requiring Soil Amendment:
195
SANITARY INFORMATION
Sanitary Type of Work:
New
Number of New Sewer Connections to the Main:
2
Number of New Dwelling Units:
221
Reuse Existing Side Sewer System:
No
SPECIAL PROGRAMS
Is this project receiving Opportunity Zone Funds?:
No
CONTRACTOR DISCLOSURE
Who will be performing all the work?:
Licensed Contractor
Contractor License:
TREEHCL8063C