PERMIT APPLICATION COMMON
Where on your property are you working?:
PER PASV SITE PLAN
Is work in the right-of-way (street or alley) required?:
No
Choose the Primary Property Use:
Multifamily
Project Value:
12100000
PERMIT TRACKING COMMON
Review Level:
Full C
Application Completed Date:
04/05/2023
FLOATING RESIDENCE INFO
Is this building a Floating Residence?:
No
CONSTRUCTION VALUATION INFO
Intake Value: New:
20009983
Intake Value: Alteration:
0
Total Intake Value:
20009983
Issue Value: New:
20009983
Issue Value: Alteration:
0
Total Issued Value:
20009983
INTERDEPARTMENTAL COORDINATION
SDOT Concept Approval:
Yes
SDOT SIP PM:
Kelsey Timmer
BUILDING CODE INFO
What building code was used for your design?:
2018 SBC
Action Type:
New
Number of Existing Building Stories:
5
Number of Proposed Building Stories:
0
Number of Proposed Below-Grade Building Stories:
3
Is a certificate of occupancy required?:
Yes
GROUND DISTURBANCE
Is your development site in an environmentally critical area (ECA)?:
No
New and Replaced Hard Surface > 750 sq ft?:
Yes
Are you doing more than 2,000 square feet of earth disturbance?:
Yes
I, the owner or owner’s authorized representative of the property referenced in this submission, give the City of Seattle Department of Planning and Development permission to conduct a Pre-Application Site Visit. I agree that: 1) electronic filing constitutes an authorizing signature; 2) I will inform all tenants of the site visit prior to the inspection being conducted; and 3) if conditions such as uncontrolled dogs or uncooperative tenants hinder the inspector’s ability to conduct the site visit, the site visit will not occur and the site visit fee may be forfeited.:
Yes
Foundation Type:
Basement
Tenant Relocation Assistance
Residential Unit Occupancy:
No Residential Units on Property
Are there residential (non-commercial) tenants/renters currently living in the property? :
No
FIRE PROTECTION SYSTEMS
Sprinklers Meet NFPA 13:
Yes
Fire Alarm:
Yes
Other Type of Sprinkler System:
*Enhanced NFPA 13 per SFC B105.2
EMERGENCY SYSTEMS
Are Emergency Systems Required for this Project?:
Yes
Elevator Pressurization:
Yes
Stairway Pressurization:
No
Accessible Elevator Egress:
Yes
MECHANICAL CODE
Does your project include an HVAC mechanical system?:
No
ENERGY CODE
Is any portion of the building semi-heated or unheated?:
Yes
Compliance Category:
Commercial
Compliance Path:
Component Performance
ENERGY EQUIPMENT
Heating Fuel Type Proposed: Residential:
Unknown
Special Requirements:
solar ready, onsite renewable energy
CONTRACTOR DISCLOSURE
Who will be performing all the work?:
Licensed Contractor
Contractor License:
ABSHEC*345PS