PERMIT APPLICATION COMMON
Where on your property are you working?:
Property is at the Southwest corner of Yesler Way and S Washington St.
Is work in the right-of-way (street or alley) required?:
Yes
Choose the Primary Property Use:
Multifamily
Project Value:
90000000
PERMIT TRACKING COMMON
Review Level:
Field
Application Completed Date:
03/19/2021
Permit Issued Date:
03/19/2021
Inspections Completed Date:
07/16/2024
SIDE SEWER INFORMATION
Related New Construction Project:
6722431
Temporary Dewatering for Construction:
Yes
Pipe Lining on Private Property:
No
Pipe Lining in the Right-of-Way:
No
Side Sewer Conflict:
No
Is the system required by the Department of Ecology?:
No
Curb Crossing and/or Staging:
Yes
Excavation:
Yes
Curb and Sidewalk Restoration?:
Yes
Roadway Restoration:
Yes
DRAINAGE INFORMATION
Number of Service Drain Lines Capped:
0
Drainage Type of Work:
None
Flow Control Type:
No Control
Flow Control Standard:
None
Treatment Standard Type:
No Treatment
Discharge Point:
Combined System
Total Disturbed Area:
30358
New Impervious Surface:
0
New Plus Replaced Impervious Surface:
0
Total Volume Managed by On-Site Stormwater Management (gallons):
0
SANITARY INFORMATION
Number of Service Sewer Lines Capped:
0
Sanitary Type of Work:
None
Reuse Existing Side Sewer System:
No
SIDE SEWER STREET USE INFO
Do you want us to create an SDOT permit application for you, for restoration or staging related to the SDCI Side Sewer permit?:
No
Do you have an existing SDOT permit related to your side sewer work?:
402334
What is the estimated start date of work in the ROW?:
05/03/2021
What is the estimated duration of work in the ROW (in calendar days)?:
548