LAND USE STREET ELEMENTS
Number of Curb Cuts for This Permit:
0
Curb Cut Size and Location:
0
PARKING
Number of Existing Onsite Parking Spaces:
42
Number of Existing Offsite Parking Spaces:
0
Number of Existing Accessible Parking Spaces:
0
Number of Proposed Onsite Parking Spaces:
0
Number of Proposed Offsite Parking Spaces:
0
Offsite Parking Location:
0
Number of Proposed Accessible Parking Spaces:
7
Number of Existing Bicycle Parking Spots:
0
Number of Proposed Bicycle Parking Spots:
116
Tenant Relocation Assistance
Residential Unit Occupancy:
No Residential Units on Property
GROUND DISTURBANCE
Is the ground disturbance in an environmentally critical area?:
No
New and Replaced Hard Surface > 750 sq ft?:
Yes
What is the amount of ground disturbance?:
Yes
I, the owner or owner’s authorized representative of the property referenced in this submission, give the City of Seattle Department of Planning and Development permission to conduct a Pre-Application Site Visit. I agree that: 1) electronic filing constitutes an authorizing signature; 2) I will inform all tenants of the site visit prior to the inspection being conducted; and 3) if conditions such as uncontrolled dogs or uncooperative tenants hinder the inspector’s ability to conduct the site visit, the site visit will not occur and the site visit fee may be forfeited.:
Yes
Foundation Type:
Spread Footing
PERMIT APPLICATION COMMON
Where on your property are you working?:
Onsite
Is work in the right-of-way (street or alley) required?:
No
Choose the Primary Property Use:
Commercial
Project Value:
62000000
PERMIT TRACKING COMMON
Review Level:
Full C
Application Completed Date:
02/09/2023
Decision Date:
05/06/2024
Start of MUP Life:
05/21/2024
Permit Remarks:
This MUP has been extended to the maximum lifespan of 6 years, per Seattle Council Bill 120674. No further extensions are allowed after the 6-year term for permits that benefit from this legislation unless a building permit has been accepted by SDCI. City Council approved an amendment to the ordinance that impacts MUPs issued Sept. 1, 2019 to Dec. 31, 2026.?
FLOATING RESIDENCE INFO
Is this building a Floating Residence?:
No
SPECIAL PROGRAMS
Is this project receiving Opportunity Zone Funds?:
No