LAND USE STREET ELEMENTS
Number of Curb Cuts for This Permit:
1
Curb Cut Size and Location:
construct and maintain 10-feet wide curb cut along Pinehurst Way NE approximately 7 feet south of the north property line.
PARKING
Number of Existing Onsite Parking Spaces:
0
Number of Existing Offsite Parking Spaces:
0
Number of Existing Accessible Parking Spaces:
0
Number of Proposed Onsite Parking Spaces:
6
Number of Proposed Offsite Parking Spaces:
0
Offsite Parking Location:
0
Number of Proposed Accessible Parking Spaces:
0
Number of Existing Bicycle Parking Spots:
0
Number of Proposed Bicycle Parking Spots:
6
Tenant Relocation Assistance
Residential Unit Occupancy:
Do Not Know-Refer to Property Owner and Tenant Assistance
GROUND DISTURBANCE
Will your project have ground disturbance?:
No
Is the ground disturbance in an environmentally critical area?:
No
I, the owner or owner’s authorized representative of the property referenced in this submission, give the City of Seattle Department of Planning and Development permission to conduct a Pre-Application Site Visit. I agree that: 1) electronic filing constitutes an authorizing signature; 2) I will inform all tenants of the site visit prior to the inspection being conducted; and 3) if conditions such as uncontrolled dogs or uncooperative tenants hinder the inspector’s ability to conduct the site visit, the site visit will not occur and the site visit fee may be forfeited.:
Yes
PERMIT APPLICATION COMMON
Is work in the right-of-way (street or alley) required?:
No
Choose the Primary Property Use:
Multifamily
Project Value:
0
PERMIT TRACKING COMMON
Review Level:
Full C
Application Completed Date:
02/28/2019
Decision Date:
06/20/2023
Start of MUP Life:
07/06/2023
Permit Remarks:
This MUP has been extended to the maximum lifespan of 6 years, per Seattle Council Bill 120674. No further extensions are allowed after the 6-year term for permits that benefit from this legislation unless a building permit has been accepted by SDCI. City Council approved an amendment to the ordinance that impacts MUPs issued Sept. 1, 2019 to Dec. 31, 2026.
FLOATING RESIDENCE INFO
Is this building a Floating Residence?:
No