PROJECT TYPE
I'm constructing a new building:
Yes
I'm making additions or changes to an existing building:
No
I'm putting up a temporary structure (e.g., tent or booth):
No
I'm tearing down a building:
Yes
I'm changing the use of a building (e.g., from office to retail space):
No
I need a master use permit:
Yes
I'm subdividing a property:
No
I'm changing a lot boundary:
No
I need a variance from the zoning code:
No
I'm installing a curb cut (ramp from sidewalk to street):
No
I'm doing grading or installing drainage:
Yes
I need a shoreline exemption to remove a hazardous tree:
No
I'm planning on using an existing approved standard plan set:
No
I think my project qualifies as subject-to-field-inspection or a DADU standard plan:
No
I am requesting a pre-submittal conference:
No
I have a vacant building on the record site address:
No
PERMIT APPLICATION COMMON
Is work in the right-of-way (street or alley) required?:
No
Choose the Primary Property Use:
Multifamily
Project Value:
12000000
GROUND DISTURBANCE
Is your development site in an environmentally critical area (ECA)?:
No
New and Replaced Hard Surface > 750 sq ft?:
Yes
Are you doing more than 750 square feet of earth disturbance?:
Yes
I, the owner or owner's authorized representative of the property referenced in this submission, give the City of Seattle Department of Construction and Inspections permission to conduct a Pre-Application Site Visit. I agree that: 1) electronic filing constitutes an authorizing signature; 2) I will inform all tenants of the site visit prior to the inspection being conducted; and 3) if conditions such as uncontrolled dogs or uncooperative tenants hinder the inspector's ability to conduct the site visit, the site visit will not occur and the site visit fee may be forfeited.:
Yes
Foundation Type:
Spread Footing
BUILDING CODE INFO
What building code was used for your design?:
2015 SBC (Struct) and SRC (Arch)
Action Type:
New